| 404430216 | Form 17 | 9/2/2025 | 11/10/2025 | SHUT-IN | 19 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 19 PSI blew down to 0 PSI within 20 minutes of test. No pressure or flow observed for the remainder of the test. |
| Click for Specifics | Light | 1/31/2025 | 2/10/2025 | | 12 | | -- | 0 | | 0 | 0 | No | No | No | |
| 403668013 | Form 17 | 1/23/2024 | 1/26/2024 | SHUT-IN | 15 | WHISPER | GAS | 0 | WHISPER | 0 | 0 | No | -- | -- | Annual test. 15 PSI whisper gas blew down to 1 PSI in 30 minutes. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403368369 | Form 17 | 3/23/2023 | 4/7/2023 | PLUNGER LIFT | 15 | CONTINUOUS | GAS | 0 | NO FLOW | 350 | 350 | No | -- | -- | Annual Test. 15 PSI gas flow blew down to 0 PSI within first 10 minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/31/2022 | 4/18/2022 | | 15 | Down to Zero | -- | 0 | Down to Zero | 290 | 290 | No | No | No | |
| Click for Specifics | Full | 11/23/2021 | 12/13/2021 | | 0 | No Flow | -- | 0 | No Flow | 350 | 350 | No | No | No | |
| Click for Specifics | Light | 9/18/2020 | 12/3/2020 | | 13 | | -- | 0 | No Flow | 220 | 220 | No | No | No | |
| Click for Specifics | Light | 6/12/2019 | 11/27/2019 | | 0 | | | 0 | No Flow | 391 | 391 | No | No | No | |
| 400433300 | Form 17 | 5/21/2013 | 6/13/2013 | PLUNGER LIFT | 10 | GAS | -- | 0 | DOWN TO 0 | 399 | 405 | No | -- | -- | Surface casing produced no fluids during form 17 test. |