|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: AB - 10/14/2025 Measured TD: 7878 ft. Vertical TD: 7878 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW AB - 10/14/2025 | | Wellbore Permit | | | Permit #: | 820830 | Expiration Date: | 9/9/1982 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/3/1982 | | Spud Date: | 5/12/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 7878 ft. | Measured PB depth: | 7773 ft. | | True Vertical TD: | 7878 ft. | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 511 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 511 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7881 ft., Weight: 10.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 6556 ft., Bottom: 7881 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4232 ft. | | | | | SHANNON | 4720 ft. | | | | | NIOBRARA | 7023 ft. | | | | | FORT HAYS | 7253 ft. | | | | | CODELL | 7274 ft. | | | | | J SAND | 7732 ft. | | | | | SKULL CREEK | 7798 ft. | | | |
Formation CODL Formation Classification: GW Status: CM - 11/3/1982 Interval Top: 7274 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 2/8/1984 | Choke Size: | 1,264.000 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | No Perforation Data was found for formation CODL. |
|
Formation NB-CD Formation Classification: GW Status: AB - 10/14/2025 Interval Top: 7200 ft. Interval Bottom: 7292 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/24/1993 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/3/1982 | | Treatment Summary: | FRACED W/114,458 GALLONS GELLED FLUID, 251510 LBS 20/40 LUCERN-UNIMIN-OTTAWA, PERFORATED THE CODELL 7282' TO 7292' PRODUCTION REFLECTS NB-CD FORMATIONS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 4 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 23500 | | CALC_MCF_GAS | 94 | | CASING_PRESS | 429 | | MCF_GAS | 94 | | TUBING_PRESS | 384 |
| | Perforation Data: | | Interval Top: | 7200 ft. | # Of Holes: | 31 | | Interval Bottom: | 7292 ft. | Hole Size: | 0.31 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/14/2025 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 5 |
| Total Gas Produced (MCF) | 5 |
| GOR | 1000 |
| GOR Determination | BOE |
| Average BOE per Day | 0.017 |
| Average MCFE per Day | 0.094 |
| Federal Financial Assurance | i | |
|
|