| 404420266 | Form 17 | 10/29/2025 | 11/6/2025 | PLUNGER LIFT | 23 | CONTINUOUS | GAS | 0 | NO FLOW | 597 | 590 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403804186 | Form 17 | 5/20/2024 | 5/28/2024 | PLUNGER LIFT | 63 | NO FLOW | NONE | 0 | NO FLOW | 530 | 529 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve.
|
| 403544058 | Form 17 | 9/27/2023 | 9/28/2023 | PLUNGER LIFT | 120 | CONTINUOUS | GAS | 0 | NO FLOW | 702 | 707 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 5/16/2022 | 6/13/2022 | Flowing | 226 | N/A | -- | 226 | N/A | 1756 | 1756 | No | No | No | Tied In |
| 402931677 | Form 17 | 1/19/2022 | 1/20/2022 | FLOWING | 1283 | CONTINUOUS | GAS | 0 | NO FLOW | 2973 | 2974 | No | -- | -- | |