|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/12/2022 Measured TD: 12903 ft. Vertical TD: 12158 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/12/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 10/21/2022 | | Proposed Top PZ Location: | Sec:7 Twp: 2S 97W | Footage: 2383 FSL 654 FEL | | Bottom Hole Location: | Sec:7 Twp: 2S 97W | Footage: 2383 FSL 654 FEL | | Proposed Depth/Form: | 12897 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 47.4 , Citings Type: PLANNED | | Cement: | Sacks: 134, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3468 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 637, Top: 1607 ft., Bottom: 3468 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12897 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 977, Top: 7460 ft., Bottom: 12897 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 1607 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 580, Top: 0 ft., Bottom: 1607 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/11/2021 | | Spud Date: | 2/8/2021 | Spud Date Is: | ACTUAL | | Measured TD: | 12903 ft. | Measured PB depth: | 12864 ft. | | True Vertical TD: | 12158 ft. | True Vertical PB depth: | 12120 ft. | | Top PZ Location: | Sec:7 Twp: 2S 97W | Footage: 2141 FSL 770 FEL | | Bottom Hole Location: | Sec:7 Twp: 2S 97W | Footage: 2416 FSL 736 FEL | | Log Types: | CBL, (DEN/NEU in API 103-10906) | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 78.67 , Citings Type: ACTUAL | | Cement: | Sacks: 199, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3486 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 794, Top: 2974 ft., Bottom: 3497 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.2 in., Top: 0 ft., Depth: 12898 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1660, Top: 5074 ft., Bottom: 12903 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 185 ft., Depth: 1283 ft., Bottom: 1283 ft., Sacks: 799, Method: DV TOOL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: , Bottom: 185 ft., Sacks: 100, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH | 2777 ft. | | N | N | | WASATCH G | 5615 ft. | | N | N | | OHIO CREEK | 7723 ft. | | N | N | | WILLIAMS FORK | 8582 ft. | | N | N | | CAMEO | 11334 ft. | | N | N | | ROLLINS | 11718 ft. | | N | N | | COZZETTE | 11867 ft. | | N | N | | CORCORAN | 12193 ft. | | N | N | | SEGO | 12448 ft. | | N | N |
Formation SEGO Formation Classification: OW Status: PR - 10/12/2022 Interval Top: 12483 ft. Interval Bottom: 12826 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 12/8/2021 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12483 ft. | # Of Holes: | 48 | | Interval Bottom: | 12826 ft. | Hole Size: | |
|
Formation CRCRN Formation Classification: OW Status: PR - 10/12/2022 Interval Top: 12041 ft. Interval Bottom: 12466 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 12/8/2021 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 12041 ft. | # Of Holes: | 48 | | Interval Bottom: | 12466 ft. | Hole Size: | |
|
Formation COZZ Formation Classification: OW Status: PR - 10/12/2022 Interval Top: 11875 ft. Interval Bottom: 12012 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 12/8/2021 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11875 ft. | # Of Holes: | 24 | | Interval Bottom: | 12012 ft. | Hole Size: | |
|
Formation WFCCCS Formation Classification: GW Status: CM - 10/7/2022 Interval Top: 9425 ft. Interval Bottom: 12826 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 12/8/2021 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/27/2021 | Treatment End Date: | 11/9/2021 | | Treatment Summary: | 192,699 bbls of Slickwater; 8,161 gals of Biocide | | Total fluid used in treatment (bbls): | 192893 | Max pressure during treatment (psi): | 7234 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 16 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 192699 | Total flowback volume recovered (bbls): | 45630 | | Fresh water used in treatment (bbls): | 194 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12477 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/2021 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1074 | | CALC_MCF_GAS | 5500 | | CASING_PRESS | 3497 | | MCF_GAS | 5500 | | TUBING_PRESS | 2590 |
| | Perforation Data: | | Interval Top: | 9425 ft. | # Of Holes: | 384 | | Interval Bottom: | 12826 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 10/12/2022 Interval Top: 9425 ft. Interval Bottom: 11713 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/8/2021 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9425 ft. | # Of Holes: | 264 | | Interval Bottom: | 11713 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 147 |
| Total Gas Produced (MCF) | 254063 |
| GOR | 1728319 |
| GOR Determination | MCFE |
| Average BOE per Day | 120.186 |
| Average MCFE per Day | 697.081 |
| Federal Financial Assurance | i | Y |
|
|