| 404281681 | Form 17 | 7/16/2025 | 7/16/2025 | SHUT-IN | 451 | CONTINUOUS | GAS | 0 | WHISPER | 239 | 236 | No | -- | -- | Annual bradenhead test performed through a two-inch valve. |
| 403824700 | Form 17 | 6/11/2024 | 6/13/2024 | CLOCK/INTERMITTER | 378 | CONTINUOUS | GAS | 5 | CONTINUOUS | 146 | 148 | No | -- | -- | TEP has initiated diagnostic testing due sustained pressure at the end of the test. |
| Click for Specifics | Full | 6/22/2023 | 7/17/2023 | Clock/Intermitter | 124 | N/A | -- | 0 | No Flow | 133 | 136 | No | No | No | 1/2" blowdown |
| 403141931 | Form 17 | 8/17/2022 | 8/19/2022 | CLOCK/INTERMITTER | 149 | NO FLOW | -- | 149 | NO FLOW | 149 | 149 | No | -- | -- | Per approval and guidance from the COGCC Area Engineer, a modified bradenhead test is being submitted to the COGCC due to pending remedial work on this well and safety concerns with performing a full bradenhead test at this time. TEP will perform a bradenhead test on the well after the proposed remedial work is complete and will submit the results to the COGCC via a Form 17. |
| Click for Specifics | Full | 9/16/2021 | 10/11/2021 | Clock/Intermitter | 150 | N/A | -- | 150 | Continuous | 150 | 150 | No | No | No | |