Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11488
Well Classification: GW Status: SI - 9/1/2025
Well Name/No:FEDERAL RGU #322-6-297
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC062046
Facility Status:SIStatus Date9/1/2025
FacilityID:301868LocationID:335602
County:RIO BLANCO #103Location:NESW 6 2s97w 6
Field:SULPHUR CREEK - #80090Elevation:6220 ft.
Basin:PICEANCE BASIN  
Planned Location:2453FSL  2193 FWLLat/Long: 39.904843 / -108.325477Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.904843 / -108.325474Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/18/2011
End Date: 4/18/2011
Reported: 4/18/2012
Prior to rule 205A.b.(2)(A)
Days to report: 366
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 9/1/2025             Measured TD: 12200 ft.    Vertical TD: 12123 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/28/2012
Proposed Top PZ Location:Sec:6 Twp: 2S 97W Footage: 1853 FNL  1975 FWL
Bottom Hole Location:Sec:6 Twp: 2S 97W Footage: 1854 FNL  1959 FWL
Proposed Depth/Form:12106 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Ryan Gulch Unit Unit Number:COC068239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 220, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3358 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 3358 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12177 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 12177 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12177 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 12177 ft.

Wellbore Completed
Completion Date:10/21/2010
Spud Date:10/4/2010Spud Date Is:ACTUAL
Measured TD:12200 ft.Measured PB depth:12077 ft.
True Vertical TD:12123 ft.True Vertical PB depth:12000 ft.
Top PZ Location:Sec:6 Twp: 2S 97WFootage: 1853 FNL  1975 FWL
Bottom Hole Location:Sec:6 Twp: 2S 97WFootage: 1854 FNL  1959 FWL
Log Types:PLATFORM EXPRESS; CBL AND RPM.
Log Types:Platform Express, CBL, Mud, and RPM
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 176 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 176 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3120 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 800, Top: 1150 ft., Bottom: 3120 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12165 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1500, Top: 2250 ft., Bottom: 12165 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 1150 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 768, Top: 0 ft., Bottom: 1150 ft., Determination Method: VISU
Additional Cement:String Type: SURF , Top: , Depth: , Bottom: , Sacks: 20, Method: Top Out
FormationInterval TopLog BottomCoredDSTs
WASATCH5143 ft.
MESAVERDE7190 ft.
CAMEO10328 ft.
ROLLINS10932 ft.
COZZETTE11088 ft.
CORCORAN11308 ft.
SEGO11664 ft.

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 9/1/2025                  Interval Top: 11667 ft.    Interval Bottom: 11945 ft.

 Completed Information for Formation SEGO
1st Production Date:4/20/2011Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11667 ft.# Of Holes:36
Interval Bottom:11945 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  SI - 9/1/2025                  Interval Top: 11337 ft.    Interval Bottom: 11646 ft.

 Completed Information for Formation CORCORAN
1st Production Date:4/20/2011Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11337 ft.# Of Holes:23
Interval Bottom:11646 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  GW                     Status:  SI - 9/1/2025                  Interval Top: 11160 ft.    Interval Bottom: 11282 ft.

 Completed Information for Formation COZZETTE
1st Production Date:4/20/2011Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:11160 ft.# Of Holes:13
Interval Bottom:11282 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 9/1/2025                  Interval Top: 7826 ft.    Interval Bottom: 10803 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/20/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7826 ft.# Of Holes:225
Interval Bottom:10803 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 6/3/2011                  Interval Top: 7826 ft.    Interval Bottom: 11945 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:4/20/2011Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/16/2011
Treatment Summary:17,329 Gals of 10% HCL; 2,792,001# of 30/50 Sand; 79,720 Bbls. Slickwater (Summary)
Tubing Size:2.375 in.Tubing Setting Depth:11692 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/3/2011Test Method:Flowing
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1070
CALC_MCF_GAS 1828
CASING_PRESS 1803
MCF_GAS 1828
TUBING_PRESS 1403
Perforation Data:
Interval Top:7826 ft.# Of Holes:297
Interval Bottom:11945 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
11/2024 - 10/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18
GOR
GOR DeterminationMCFE
Average BOE per Day0.008
Average MCFE per Day0.048

 Federal Financial Assurance  i Y

 Tribal Well  i No