| 404223905 | Form 17 | 5/27/2025 | 5/30/2025 | PLUNGER LIFT | 161 | CONTINUOUS | GAS | 0 | NO FLOW | 342 | 345 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403658190 | Form 17 | 1/17/2024 | 1/18/2024 | FLOWING | 372 | CONTINUOUS | GAS | 0 | NO FLOW | 1390 | 1390 | No | -- | -- | The test was performed with a 2-inch valve. |
| Click for Specifics | Full | 12/5/2023 | 12/11/2023 | Flowing | 6 | N/A | -- | 0 | No Flow | 1560 | 1575 | No | No | No | 1/2 bh |