Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-24570
Well Classification: GW Status: PR - 12/18/2023
Well Name/No:Leverich #WMC 512-18-793
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/18/2023
FacilityID:483812LocationID:335045
County:GARFIELD #045Location:LOT 3 13 7S94W 6
Field:RULISON - #75400Elevation:8007 ft.
Basin:PICEANCE BASIN  
Planned Location:1418FSL  829 FELLat/Long: 39.435628 / -107.829054Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435627 / -107.829053Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/12/2023
End Date: 11/22/2023
Reported: 12/28/2023
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/18/2023             Measured TD: 10740 ft.    Vertical TD: 10050 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/18/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/29/2025
Proposed Top PZ Location:Sec:13 Twp: 7S 94W Footage: 2288 FNL  1403 FWL
Bottom Hole Location:Sec:13 Twp: 7S 94W Footage: 2317 FNL  1373 FWL
Proposed Depth/Form:11005 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1134 ft., Weight: 36.0 , Citings Type: PLANNED
Cement:Sacks: 279, Top: 0 ft., Bottom: 1134 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11005 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 792, Top: 6229 ft., Bottom: 11005 ft.

Wellbore Completed
Completion Date:9/19/2023
Spud Date:9/14/2023Spud Date Is:ACTUAL
Measured TD:10740 ft.Measured PB depth:10694 ft.
True Vertical TD:10050 ft.True Vertical PB depth:10004 ft.
Top PZ Location:Sec:13 Twp: 7S 94WFootage: 2288 FNL  1403 FWL
Bottom Hole Location:Sec:13 Twp: 7S 94WFootage: 2317 FNL  1373 FWL
Log Types:CBL, (RES on 045-24555 and 045-24560)
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1177 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 345, Top: 0 ft., Bottom: 1177 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10740 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1118, Top: 5060 ft., Bottom: 10740 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH1562 ft.
WASATCH G4484 ft.
OHIO CREEK7364 ft.
WILLIAMS FORK7730 ft.
CAMEO9811 ft.
ROLLINS10629 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/18/2023                Interval Top: 8102 ft.    Interval Bottom: 10584 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/18/2023Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:11/12/2023Treatment End Date:11/22/2023
Treatment Summary:129,351 bbls of Slickwater; 2,483,035 of Proppant; 2,265 gals of Biocide
Total fluid used in treatment (bbls):129405Max pressure during treatment (psi):7454
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:13
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):129351Total flowback volume recovered (bbls):36599
Fresh water used in treatment (bbls):54Disposition method For flowback:RECYCLE
Total proppant used (lbs):2483035Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:10343 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/18/2023Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1078
CALC_MCF_GAS 633
CASING_PRESS 2224
MCF_GAS 633
TUBING_PRESS 1408
Perforation Data:
Interval Top:8102 ft.# Of Holes:312
Interval Bottom:10584 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)273
Total Gas Produced (MCF)211023
GOR772978
GOR DeterminationMCFE
Average BOE per Day100.586
Average MCFE per Day583.375

 Federal Financial Assurance  i 

 Tribal Well  i No