| 404359695 | Form 17 | 9/18/2025 | 9/18/2025 | PLUNGER LIFT | 363 | CONTINUOUS | GAS | 0 | WHISPER | 137 | 135 | No | -- | -- | |
| 404185319 | Form 17 | 4/30/2025 | 4/30/2025 | PLUNGER LIFT | 398 | CONTINUOUS | GAS | 0 | NO FLOW | 131 | 130 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. Well cycled during test. |
| 403746522 | Form 17 | 4/5/2024 | 4/8/2024 | PLUNGER LIFT | 560 | CONTINUOUS | GAS | 0 | NO FLOW | 137 | 140 | No | -- | -- | The test was performed through a 1/2" valve. |
| Click for Specifics | Full | 1/23/2024 | 2/5/2024 | Plunger Lift | 492 | N/A | -- | 0 | No Flow | 154 | 152 | No | No | No | 1/2 Blowdown |
| Click for Specifics | Full | 2/20/2023 | 3/15/2023 | Plunger Lift | 334 | N/A | -- | 0 | No Flow | 141 | 150 | No | No | No | 1/2" blowdown |
| Click for Specifics | Full | 2/3/2022 | 3/7/2022 | Plunger Lift | 151 | N/A | -- | 0 | No Flow | 144 | 154 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 7/26/2021 | 8/9/2021 | Plunger Lift | 207 | N/A | -- | 0 | No Flow | 148 | 148 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 4 | | -- | -- | No | No | No | |