Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22232
Well Classification: GW Status: PR - 4/21/2014
Well Name/No:PA #331-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/21/2014
FacilityID:435145LocationID:335035
County:GARFIELD #045Location:LOT 10 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5152 ft.
Basin:PICEANCE BASIN  
Planned Location:706FSL  794 FWLLat/Long: 39.461707 / -108.046442Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461707 / -108.046442Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/24/2014
End Date: 3/30/2014
Reported: 5/1/2014
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/21/2014             Measured TD: 7305 ft.    Vertical TD: 6505 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/21/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:7 Twp: 7S 95W Footage: 155 FNL  2087 FEL
Bottom Hole Location:Sec:7 Twp: 7S 95W Footage: 171 FNL  2049 FEL
Proposed Depth/Form:7283 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-61 , Unit Acreage: 10, Drill Unit: N 1/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1593 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 413, Top: 0 ft., Bottom: 1593 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7291 ft., Weight: 11 , Citings Type: PLANNED
Cement:Sacks: 824, Top: 0 ft., Bottom: 7291 ft.

Wellbore Completed
Completion Date:2/13/2014
Spud Date:2/5/2014Spud Date Is:ACTUAL
Measured TD:7305 ft.Measured PB depth:7257 ft.
True Vertical TD:6505 ft.True Vertical PB depth:6457 ft.
Top PZ Location:Sec:7 Twp: 7S 95WFootage: 155 FNL  2087 FEL
Bottom Hole Location:Sec:7 Twp: 7S 95WFootage: 171 FNL  2049 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1774 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 447, Top: 0 ft., Bottom: 1774 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7290 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 3578 ft., Bottom: 7290 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1469 ft.
MESAVERDE4046 ft.
CAMEO6598 ft.
ROLLINS7138 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 4/21/2014                 Interval Top: 5103 ft.    Interval Bottom: 7070 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/1/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/24/2014Treatment End Date:3/30/2014
Treatment Summary:1082790# 40/70 Sand; 29856 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):29856Max pressure during treatment (psi):4295
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):29856Total flowback volume recovered (bbls):9293
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1082790Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6855 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/21/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1065
CALC_MCF_GAS 810
CASING_PRESS 1413
MCF_GAS 810
TUBING_PRESS 1068
Perforation Data:
Interval Top:5103 ft.# Of Holes:141
Interval Bottom:7070 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)72
Total Gas Produced (MCF)41270
GOR573194
GOR DeterminationMCFE
Average BOE per Day19.688
Average MCFE per Day114.200

 Federal Financial Assurance  i 

 Tribal Well  i No