| 404209466 | Form 17 | 5/19/2025 | 5/19/2025 | PLUNGER LIFT | 147 | CONTINUOUS | GAS | 0 | WHISPER | 158 | 161 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 1/2 inch valve. |
| 403659169 | Form 17 | 1/16/2024 | 1/18/2024 | PLUNGER LIFT | 146 | CONTINUOUS | GAS | 0 | WHISPER | 171 | 171 | No | -- | -- | This is an annual bradenhead test using the ECMC approved pilot testing procedure for 2024 which does not involve a seven-day shut-in of the connected bradenhead prior to performing the test. The bradenhead is connected to the flowline and a pressure management plan has been submitted to the ECMC. The test was performed through a 1/2" valve. |
| 403598222 | Form 17 | 11/15/2023 | 11/16/2023 | PLUNGER LIFT | 221 | CONTINUOUS | GAS | 0 | WHISPER | 163 | 155 | No | -- | -- | The test was performed through a 2" valve. |
| 403481214 | Form 17 | 7/18/2023 | 7/31/2023 | PLUNGER LIFT | 228 | CONTINUOUS | GAS | 0 | WHISPER | 173 | 174 | No | -- | -- | The test was performed through a 2" valve. |
| Click for Specifics | Full | 3/15/2023 | 4/10/2023 | Plunger Lift | 141 | N/A | -- | 0 | No Flow | 182 | 177 | No | No | No | 2" valve |
| Click for Specifics | Full | 2/15/2022 | 3/7/2022 | Plunger Lift | 109 | N/A | -- | 88 | Surge | 109 | 149 | No | No | No | 1/2 valve |
| Click for Specifics | Full | 8/20/2021 | 9/6/2021 | Plunger Lift | 100 | N/A | -- | 0 | No Flow | 165 | 165 | No | No | No | |
| 402291268 | Form 17 | 1/23/2020 | 1/30/2020 | PLUNGER LIFT | 35 | CONTINUOUS | -- | 0 | NO FLOW | 147 | 145 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 148 | | -- | -- | No | No | No | |