Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15978
Well Classification: GW Status: PR - 7/31/2010
Well Name/No:FEDERAL #SG 342-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC59137
Facility Status:PRStatus Date7/31/2010
FacilityID:296295LocationID:335042
County:GARFIELD #045Location:NENE 26 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5243 ft.
Basin:PICEANCE BASIN  
Planned Location:1158FNL  623 FELLat/Long: 39.412356 / -108.069525Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.412356 / -108.069525Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2010             Measured TD: 5535 ft.    Vertical TD: 5487 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2010
Wellbore PermitDIRECTIONAL
Permit #:20090286 Expiration Date:3/31/2010
Proposed Top PZ Location:Sec:26 Twp: 7S 96W Footage: 1715 FNL  578 FEL
Bottom Hole Location:Sec:26 Twp: 7S 96W Footage: 1733 FNL  592 FEL
Proposed Depth/Form:5509 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:8/16/2009
Spud Date:8/13/2009Spud Date Is:ACTUAL
Measured TD:5535 ft.Measured PB depth:5326 ft.
True Vertical TD:5487 ft.True Vertical PB depth:5278 ft.
Top PZ Location:Sec:26 Twp: 7S 96WFootage: 1715 FNL  578 FEL
Bottom Hole Location:Sec:26 Twp: 7S 96WFootage: 1733 FNL  592 FEL
Log Types:MUD, RMTE, RA-BOND
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 709 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 709 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5512 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 877, Top: 2965 ft., Bottom: 5512 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND888 ft.
WASATCH G888 ft.NN
MESAVERDE2617 ft.
CAMEO4868 ft.
ROLLINS5388 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2010                 Interval Top: 2290 ft.    Interval Bottom: 5322 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/29/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/26/2010
Treatment Summary:2974 GALS 7 1/2% HCL; 662863# 30/50 SAND; 14545 BBLS SLICKWATER; 111 TONS N2 (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:5112 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1082
CASING_PRESS 1119
MCF_GAS 1151
TUBING_PRESS 1038
Perforation Data:
Interval Top:2290 ft.# Of Holes:118
Interval Bottom:5322 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)16923
GOR735782
GOR DeterminationMCFE
Average BOE per Day8.041
Average MCFE per Day46.677

 Federal Financial Assurance  i Y

 Tribal Well  i No