Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-15978
Well Classification: GW Status: PR - 7/31/2010
Well Name/No:FEDERAL #SG 342-26
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC59137
Facility Status:PRStatus Date7/31/2010
FacilityID:296295LocationID:335042
County:GARFIELD #045Location:NENE 26 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5243 ft.
Basin:PICEANCE BASIN  
Planned Location:1158FNL  623 FELLat/Long: 39.412356 / -108.069525Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.412356 / -108.069525Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/31/2010             Measured TD: 5535 ft.    Vertical TD: 5487 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/31/2010
Wellbore PermitDIRECTIONAL
Permit #:20090286 Expiration Date:3/31/2010
Proposed Top PZ Location:Sec:26 Twp: 7S 96W Footage: 1715 FNL  578 FEL
Bottom Hole Location:Sec:26 Twp: 7S 96W Footage: 1733 FNL  592 FEL
Proposed Depth/Form:5509 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:8/16/2009
Spud Date:8/13/2009Spud Date Is:ACTUAL
Measured TD:5535 ft.Measured PB depth:5326 ft.
True Vertical TD:5487 ft.True Vertical PB depth:5278 ft.
Top PZ Location:Sec:26 Twp: 7S 96WFootage: 1715 FNL  578 FEL
Bottom Hole Location:Sec:26 Twp: 7S 96WFootage: 1733 FNL  592 FEL
Log Types:MUD, RMTE, RA-BOND
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 709 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 225, Top: 0 ft., Bottom: 709 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 5512 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 877, Top: 2965 ft., Bottom: 5512 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
J SAND888 ft.
WASATCH G888 ft.NN
MESAVERDE2617 ft.
CAMEO4868 ft.
ROLLINS5388 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/31/2010                 Interval Top: 2290 ft.    Interval Bottom: 5322 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/29/2010Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:5/26/2010
Treatment Summary:2974 GALS 7 1/2% HCL; 662863# 30/50 SAND; 14545 BBLS SLICKWATER; 111 TONS N2 (SUMMARY).
Tubing Size:2.375 in.Tubing Setting Depth:5112 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/31/2010Test Method:FLOWING
Hours Tested:21Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1082
CASING_PRESS 1119
MCF_GAS 1151
TUBING_PRESS 1038
Perforation Data:
Interval Top:2290 ft.# Of Holes:118
Interval Bottom:5322 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)17259
GOR784500
GOR DeterminationMCFE
Average BOE per Day8.197
Average MCFE per Day47.581

 Federal Financial Assurance  i Y

 Tribal Well  i No