| 404184640 | Form 17 | 4/25/2025 | 4/30/2025 | PLUNGER LIFT | 340 | CONTINUOUS | GAS | 0 | NO FLOW | 143 | 150 | No | -- | -- | This is an annual bradenhead test that was performed on day three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403810713 | Form 17 | 5/31/2024 | 6/3/2024 | PLUNGER LIFT | 339 | NO FLOW | NONE | 0 | NO FLOW | 155 | 141 | No | -- | -- | This is an annual bradenhead test that was performed on Day Three of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve. |
| 403372489 | Form 17 | 4/10/2023 | 4/13/2023 | PLUNGER LIFT | 340 | CONTINUOUS | GAS | 0 | NO FLOW | 171 | 160 | No | -- | -- | This is an annual bradenhead test that was performed on day six of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2" valve. |
| Click for Specifics | Full | 3/14/2023 | 4/10/2023 | Plunger Lift | 134 | N/A | -- | 0 | No Flow | 170 | 164 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 10/25/2022 | 11/8/2022 | Plunger Lift | 128 | N/A | -- | 0 | No Flow | 172 | 168 | No | No | No | |
| 402713226 | Form 17 | 6/1/2021 | 6/9/2021 | PLUNGER LIFT | 223 | CONTINUOUS | GAS | 4 | CONTINUOUS | 202 | 194 | No | -- | -- | |
| Click for Specifics | Full | 6/1/2021 | 7/12/2021 | Plunger Lift | 223 | N/A | -- | 0 | Continuous | 202 | 194 | No | No | No | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 321 | | -- | -- | No | No | No | |