Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-10180
Well Classification: GW Status: PR - 3/10/2005
Well Name/No:FEDERAL #RWF 13-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 62160
Facility Status:PRStatus Date3/10/2005
FacilityID:272857LocationID:335434
County:GARFIELD #045Location:NWSW 19 6S94W 6
Field:RULISON - #75400Elevation:5731 ft.
Basin:PICEANCE BASIN  
Planned Location:1427FSL  381 FWLLat/Long: 39.507019 / -107.936901Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507081 / -107.936887Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/10/2005             Measured TD: 8275 ft.    Vertical TD: 8269 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/10/2005
Wellbore Permit
Permit #:20041422 Expiration Date:7/1/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1566 FSL  245 FWL
Bottom Hole Location:Sec: Twp: Footage: 1566 FSL  245 FWL
Proposed Depth/Form:8325 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-10 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:1/7/2005
Spud Date:9/16/2004Spud Date Is:ACTUAL
Measured TD:8275 ft.Measured PB depth:8230 ft.
True Vertical TD:8269 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1566 FSL  245 FWL
Bottom Hole Location:Sec: Twp: Footage: 1566 FSL  245 FWL
Log Types:HIGH RESOLUTION INDUCTION SPECTRAL DENSITY DUAL SPACED NEUTRON, CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 480, Top: 0 ft., Bottom: 1131 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8259 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 950, Top: 4500 ft., Bottom: 8259 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2439 ft.NN
MESAVERDE4801 ft.NN
CAMEO7350 ft.NN
ROLLINS8247 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/10/2005                 Interval Top: 5857 ft.    Interval Bottom: 8128 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/7/2005
Treatment Summary:4750 GALS 7 1/2% HCL, 728899# 30/50, 17142 BBLS SLICK WATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:5682 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/10/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1657
CASING_PRESS 2189
MCF_GAS 1657
TUBING_PRESS 2152
Perforation Data:
Interval Top:5857 ft.# Of Holes:108
Interval Bottom:8128 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)42
Total Gas Produced (MCF)26070
GOR620714
GOR DeterminationMCFE
Average BOE per Day12.436
Average MCFE per Day72.107

 Federal Financial Assurance  i Y

 Tribal Well  i No