| 404184656 | Form 17 | 4/29/2025 | 4/30/2025 | PLUNGER LIFT | 314 | CONTINUOUS | GAS | 0 | WHISPER | 141 | 135 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the flow line with an approved pressure management plan. The test was performed through a 2 inch valve. Well cycled during test. |
| 403810864 | Form 17 | 5/30/2024 | 6/3/2024 | PLUNGER LIFT | 332 | NO FLOW | NONE | 0 | WHISPER | 139 | 145 | No | -- | -- | This is an annual bradenhead test that was performed after a seven-day shut-in period. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2 inch valve.
|
| 403372457 | Form 17 | 4/10/2023 | 4/13/2023 | PLUNGER LIFT | 349 | CONTINUOUS | GAS | 0 | WHISPER | 153 | 153 | No | -- | -- | This is an annual bradenhead test that was performed on day six of the seven-day shut-in period due to the bradenhead exceeding the threshold pressure. The bradenhead is connected to the sales separator with an approved pressure management plan. The test was performed through a 2" valve. |
| Click for Specifics | Full | 3/15/2023 | 4/10/2023 | Plunger Lift | 194 | N/A | -- | 0 | Whisper | 162 | 149 | No | No | No | 2" blowdown |
| Click for Specifics | Full | 10/25/2022 | 11/8/2022 | Plunger Lift | 204 | N/A | -- | 0 | Whisper | 178 | 162 | No | No | No | 2” blow down |
| Click for Specifics | Full | 6/2/2021 | 7/12/2021 | Plunger Lift | 482 | N/A | -- | 0 | Continuous | 172 | 172 | No | No | No | |
| 402713316 | Form 17 | 6/2/2021 | 6/9/2021 | PLUNGER LIFT | 482 | CONTINUOUS | GAS | 11 | CONTINUOUS | 172 | 172 | No | -- | -- | |
| Click for Specifics | Light | 10/1/2015 | 6/2/2020 | | -- | | | 488 | | -- | -- | No | No | No | |