Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-09964
Well Classification: OW Status: PR - 9/9/2004
Well Name/No:FEDERAL #RWF 533-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 60132
Facility Status:PRStatus Date9/9/2004
FacilityID:271817LocationID:335368
County:GARFIELD #045Location:NWSE 19 6S94W 6
Field:RULISON - #75400Elevation:5570 ft.
Basin:PICEANCE BASIN  
Planned Location:1517FSL  2245 FELLat/Long: 39.507349 / -107.929111Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.507405 / -107.929100Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/9/2004             Measured TD: 8017 ft.    Vertical TD: 7996 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/9/2004
Wellbore PermitDIRECTIONAL
Permit #:20040603 Expiration Date:4/5/2005
Proposed Top PZ Location:Sec: Twp: Footage: 1640 FSL  2437 FEL
Bottom Hole Location:Sec: Twp: Footage: 1640 FSL  2437 FEL
Proposed Depth/Form:8140 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-40 , Unit Acreage: 320, Drill Unit: S/2

Wellbore Completed
Completion Date:8/4/2004
Spud Date:5/19/2004Spud Date Is:ACTUAL
Measured TD:8017 ft.Measured PB depth:7971 ft.
True Vertical TD:7996 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 1640 FSL  2437 FEL
Bottom Hole Location:Sec: Twp: Footage: 1640 FSL  2437 FEL
Log Types:HIGH RESOLUTIN IND,SPECTRAL DEN.DUAL SPACED NEU,CBL
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 45 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 25, Top: 0 ft., Bottom: 45 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 515, Top: 0 ft., Bottom: 1124 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8012 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1010, Top: 4350 ft., Bottom: 8012 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2221 ft.NN
MESAVERDE4612 ft.NN
CAMEO7179 ft.NN
ROLLINS8139 ft.NN

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 9/9/2004                  Interval Top: 5764 ft.    Interval Bottom: 7941 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:N/AChoke Size:0.203 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2004
Treatment Summary:4000 GALS 7 1/2% 589553# 30/50, 13980 BBLS SLICKWATER (SUMMARY)
Tubing Size:2.375 in.Tubing Setting Depth:7315 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/9/2004Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 1882
CASING_PRESS 2201
MCF_GAS 1882
TUBING_PRESS 2118
Perforation Data:
Interval Top:5764 ft.# Of Holes:97
Interval Bottom:7941 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)66
Total Gas Produced (MCF)23508
GOR356181
GOR DeterminationMCFE
Average BOE per Day11.287
Average MCFE per Day65.466

 Federal Financial Assurance  i Y

 Tribal Well  i No