| 402221442 | Form 17 | 10/23/2019 | 10/25/2019 | FLOWING | 80 | CONTINUOUS | -- | 0 | NO FLOW | 186 | 190 | Yes | Yes | No | P&A. 80 psig initial surface casing. Down to 5 psig in 5 minutes, 0 psig within 10 minutes. Gas sample taken. |
| 402161716 | Form 17 | 8/28/2019 | 8/29/2019 | FLOWING | 92 | CONTINUOUS | -- | 0 | NO FLOW | 191 | 165 | Yes | Yes | No | P&A. 92 psig initial surface casing. Down to 0 psig within 10 minutes. Gas sample taken.
|
| 402051251 | Form 17 | 5/15/2019 | 5/21/2019 | FLOWING | 108 | CONTINUOUS | -- | 44 | CONTINUOUS | 187 | 175 | Yes | Yes | No | State requested. Annual. 108 psig initial surface casing. 44 psig final pressure. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 07-14-2019 per COGCC Order No. 1-232 NTO Guidance.
|