Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-013-06588
Well Classification: GW Status: PA - 11/19/2019
Well Name/No:SHAFFER NEWMAN #0-6-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/19/2019
FacilityID:296096LocationID:335913
County:BOULDER #013Location:SWSW 13 1N69W 6
Field:WATTENBERG - #90750Elevation:5112 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:492FSL  863 FWLLat/Long: 40.045410 / -105.071430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.045415 / -105.071407Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 11/19/2019             Measured TD: 8540 ft.    Vertical TD: 8405 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 11/19/2019
Wellbore PermitDIRECTIONAL
Permit #:20081550 Expiration Date:5/15/2009
Proposed Top PZ Location:Sec:13 Twp: 1N 69W Footage: 1512 FSL  72 FWL
Bottom Hole Location:Sec:13 Twp: 1N 69W Footage: 1512 FSL  72 FWL
Proposed Depth/Form:8570 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5483 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 250, Top: 4449 ft., Bottom: 5483 ft.

Wellbore Completed
Completion Date:4/22/2009
Spud Date:4/15/2009Spud Date Is:ACTUAL
Measured TD:8540 ft.Measured PB depth:8506 ft.
True Vertical TD:8405 ft.True Vertical PB depth:8371 ft.
Top PZ Location:Sec:13 Twp: 1N 69WFootage: 1512 FSL  72 FWL
Bottom Hole Location:Sec:13 Twp: 1N 69WFootage: 1512 FSL  72 FWL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 827 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 390, Top: 0 ft., Bottom: 827 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8527 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 240, Top: 6950 ft., Bottom: 8527 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7622 ft.NN
CODELL8022 ft.NN
J SAND8450 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/19/2019                Interval Top: 8459 ft.    Interval Bottom: 8479 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/6/2009
Treatment Summary:JSAND COMPLETION. FRAC'D THE J SAND WITH 155198 GAL 22# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251280# SAND 05/06/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:8459 ft.# Of Holes:40
Interval Bottom:8479 ft.Hole Size:0.41 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 5/30/2009                 Interval Top: 7788 ft.    Interval Bottom: 8479 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/22/2009
Treatment Summary:JSND-CD-NB COMMINGLE. DRILLED OUT CFP @7910' 5/25/09. DRILLED OUT CFP @8150' TO COMMINGLE THE JSND-CD-NB 5/26/09
Tubing Size:2.375 in.Tubing Setting Depth:8432 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/30/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 141
BBLS_OIL 62
BTU_GAS 2573
CALC_BBLS_H2O 141
CALC_BBLS_OIL 62
CALC_GOR 4097
CALC_MCF_GAS 254
CASING_PRESS 1418
GRAVITY_OIL 50
MCF_GAS 254
TUBING_PRESS 500
Perforation Data:
Interval Top:7788 ft.# Of Holes:136
Interval Bottom:8479 ft.Hole Size:0.41 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/19/2019                Interval Top: 7788 ft.    Interval Bottom: 8038 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:5/6/2009
Treatment Summary:NB-CD COMPLETION. SET CFP @8150' FRAC'D CD W/113148 GAL 26# VISTAR HYBRID X-LINKED GEL CONTAIN 251800# SND. SET CFP @7910' FRAC'D NB W/134568 GAL 20-18# VISTAR X-LINKED GEL CONTAIN 241350# SAND 05/06/09
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7788 ft.# Of Holes:96
Interval Bottom:8038 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/19/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No