Click for Specifics | Full | 4/26/2024 | 4/30/2024 | | 2 | Down to Zero | -- | 0 | Down to Zero | 636 | 639 | No | No | No | |
403381441 | Form 17 | 4/21/2023 | 4/24/2023 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 1443 | 1443 | No | -- | -- | Post-Production test within 60 days of first sales. 0 PSI, no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
403003828 | Form 17 | 3/28/2022 | 4/4/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |