Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-001-10518
Well Classification: OW Status: PR - 4/1/2023
Well Name/No:GUS LD #15-035HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2023
FacilityID:476887LocationID:476754
County:ADAMS #001Location:SENE 21 1S67W 6
Field:WATTENBERG - #90750Elevation:5127 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1679FNL  306 FELLat/Long: 39.953020 / -104.885412Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.953019 / -104.885411Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/12/2023
End Date: 2/22/2023
Reported: 3/21/2023
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2023             Measured TD: 17153 ft.    Vertical TD: 7629 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/10/2022
Proposed Top PZ Location:Sec:22 Twp: 1S 67W Footage: 2560 FNL  1550 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67W Footage: 370 FNL  1550 FEL
Proposed Depth/Form:16708 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2794 , Unit Acreage: 960, Drill Unit: SEC15:ALL SEC22:N2
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1772 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 693, Top: 0 ft., Bottom: 1772 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 16708 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1854, Top: 5144 ft., Bottom: 16708 ft.

Wellbore Completed
Completion Date:1/14/2022
Spud Date:11/17/2021Spud Date Is:ACTUAL
Measured TD:17153 ft.Measured PB depth:17147 ft.
True Vertical TD:7629 ft.True Vertical PB depth:7629 ft.
Top PZ Location:Sec:22 Twp: 1S 67WFootage: 2560 FNL  1549 FEL
Bottom Hole Location:Sec:15 Twp: 1S 67WFootage: 319 FNL  1543 FEL
Log Types:MWD/LWD, Mud, CBL (Composite in 001-10516)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2059 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1054, Top: 0 ft., Bottom: 2059 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17153 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1835, Top: 2562 ft., Bottom: 17153 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5116 ft.5317 ft.NN
SUSSEX5571 ft.5824 ft.NN
SHANNON6502 ft.6713 ft.NN
SHARON SPRINGS8912 ft.NN
NIOBRARA9088 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/1/2023                  Interval Top: 9691 ft.    Interval Bottom: 17004 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/30/2023Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/12/2023Treatment End Date:2/22/2023
Treatment Summary:20 Stage Plug and Perf Total Fluid: 123,068 bbls Gel Fluid: 39,174 bbls Slickwater Fluid: 83,644 bbls 15% HCl Acid: 250 bbls Total Proppant: 4,423,075 lbs Silica Proppant: 4,423,075 lbs Method for determining flowback: Measuring flowback tank volumes.
Total fluid used in treatment (bbls):123068Max pressure during treatment (psi):4643
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):250Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2566
Fresh water used in treatment (bbls):122818Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4423075Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9231 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/1/2023Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1091
BBLS_OIL 282
BTU_GAS 1409
CALC_BBLS_H2O 1091
CALC_BBLS_OIL 282
CALC_GOR 922
CALC_MCF_GAS 260
CASING_PRESS 2600
GRAVITY_OIL 44
MCF_GAS 260
TUBING_PRESS 1950
Perforation Data:
Interval Top:9691 ft.# Of Holes:719
Interval Bottom:17004 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)21298
Total Gas Produced (MCF)89530
GOR4203
GOR DeterminationBOE
Average BOE per Day100.685
Average MCFE per Day583.980

 Federal Financial Assurance  i 

 Tribal Well  i No