Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-001-10267B-Farm LD
18-382HC
PDC ENERGY INC
69175
PR
12/20/2022
WATTENBERG
90750
ADAMS  001
NENW 7 1S67W 6
452914
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 2038 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull4/12/20244/16/2024 8Down to Zero--0Down to Zero822821NoNoNoAnnual Test.  8 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403696288Form 172/22/20242/23/2024FLOWING63CONTINUOUS GAS AND LIQUID HYDROCARBON0 NO FLOW 883883No----Automation Alert follow-up test. 63 PSI gas and fluid blew down down to 0 PSI in 90 seconds. Steady drip until 16 minute mark, no flow or pressure for the remainder of the test, ~1 gallon total fluid. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull5/30/20236/5/2023Flowing0Down to Zero--0Down to Zero15491549NoNoneNone 
403355470Form 173/23/20233/24/2023FLOWING95DOWN TO 0 MUD0 CONTINUOUS 20262066Yes----Automation Alert follow-up. 95 PSI mud on open, produced ~2 gallons and died to drip. Mud stopped for at ten minute mark and restarted at 15 minute mark and continued for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy.
403265348Form 1712/19/202212/19/2022FLOWING6DOWN TO 0 GAS0 NO FLOW 24902489No----Post-Production within 60 days of first sales. 6 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test.
403095619Form 177/1/20227/5/2022SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.