|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/20/2022 Measured TD: 18479 ft. Vertical TD: 8000 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/20/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 11/3/2020 | | Proposed Top PZ Location: | Sec:7 Twp: 1S 67W | Footage: 460 FNL 470 FWL | | Bottom Hole Location: | Sec:19 Twp: 1S 67W | Footage: 9 FNL 495 FWL | | Proposed Depth/Form: | 18523 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 1080, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 707, Top: 0 ft., Bottom: 1700 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18523 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 1878, Top: 4827 ft., Bottom: 18523 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/5/2022 | | Spud Date: | 4/23/2020 | Spud Date Is: | ACTUAL | | Measured TD: | 18479 ft. | Measured PB depth: | 18467 ft. | | True Vertical TD: | 8000 ft. | True Vertical PB depth: | 8003 ft. | | Top PZ Location: | Sec:7 Twp: 1S 67W | Footage: 460 FNL 470 FWL | | Bottom Hole Location: | Sec:19 Twp: 1S 67W | Footage: 9 FNL 495 FWL | | Log Types: | | | Log Types: | CBL, MWD, DIL in 05-001-10098 | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2038 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 930, Top: 0 ft., Bottom: 2038 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 18478 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 1990, Top: 2662 ft., Bottom: 18478 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4584 ft. | | | | | SUSSEX | 4971 ft. | | | | | SHANNON | 6085 ft. | | | | | SHARON SPRINGS | 7584 ft. | | | | | NIOBRARA | 7732 ft. | | | | | FORT HAYS | 8336 ft. | | | | | CODELL | 8467 ft. | | | | | CARLILE | 12094 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 9/27/2024 Interval Top: 12094 ft. Interval Bottom: 12300 ft.| Completed Information for Formation CARLILE | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CARLILE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/27/2024 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 12,094’ – 12,300’ | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CARL. |
| | Perforation Data: | | Interval Top: | 12094 ft. | # Of Holes: | 1960 | | Interval Bottom: | 12300 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 9/27/2024 Interval Top: 10453 ft. Interval Bottom: 17754 ft.| Completed Information for Formation FORT HAYS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | FORT HAYS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/27/2024 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 10,453’ – 10,660’, 16,573’ – 17,100’, 17,630’ – 17,754’ | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FTHYS. |
| | Perforation Data: | | Interval Top: | 10453 ft. | # Of Holes: | 1960 | | Interval Bottom: | 17754 ft. | Hole Size: | 0.42 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 12/20/2022 Interval Top: 8395 ft. Interval Bottom: 18296 ft.| Completed Information for Formation CARLILE-CODELL-FORT HAYS | | 1st Production Date: | 12/7/2022 | Choke Size: | | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/31/2022 | Treatment End Date: | 11/18/2022 | | Treatment Summary: | 55 Stage Plug and Perf
Total Fluid: 237,647 bbls
Gel Fluid: 163,231 bbls
Slickwater Fluid: 73,559 bbls
15% HCl Acid: 857 bbls
Total Proppant: 14,961,315 lbs
Silica Proppant: 14,961,315 lbs
Method for determining flowback: Measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 237647 | Max pressure during treatment (psi): | 4706 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 55 | | Total acid used in treatment (bbls): | 857 | Min frac gradient (psi/ft): | 0.94 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 7763 | | Fresh water used in treatment (bbls): | 236790 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 14961315 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8221 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/20/2022 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 601 | | BBLS_OIL | 426 | | BTU_GAS | 1362 | | CALC_BBLS_H2O | 601 | | CALC_BBLS_OIL | 426 | | CALC_GOR | 1913 | | CALC_MCF_GAS | 815 | | CASING_PRESS | 2444 | | GRAVITY_OIL | 45 | | MCF_GAS | 815 | | TUBING_PRESS | 1780 |
| | Perforation Data: | | Interval Top: | 8395 ft. | # Of Holes: | 1960 | | Interval Bottom: | 18296 ft. | Hole Size: | 0.42 in. |
|
Formation CODL Formation Classification: OW Status: CM - 9/27/2024 Interval Top: 8395 ft. Interval Bottom: 18296 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 9/27/2024 | Treatment End Date: | N/A | | Treatment Summary: | Completed Depths: 8,395’-10,453’, 10,660’ – 12,094’, 12,300’ – 16,573’, 17,100’ – 17,630’, 17,754’ – 18,478’ | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 8395 ft. | # Of Holes: | 1960 | | Interval Bottom: | 18296 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 26086 |
| Total Gas Produced (MCF) | 265227 |
| GOR | 10167 |
| GOR Determination | BOE |
| Average BOE per Day | 192.289 |
| Average MCFE per Day | 1115.300 |
| Federal Financial Assurance | i | |
|
|