404204161 | Form 17 | 4/30/2025 | 5/14/2025 | GAS LIFT | 35 | CONTINUOUS | WATER AND GAS | 1 | WHISPER | 826 | 826 | No | -- | -- | Annual Test. 35 PSI continuous water and gas blew down to 1 PSI within thirty minutes of test. Whisper water observed for entire test, ~1 gal of fluid collected. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 11/6/2024 | 11/12/2024 | | 2 | Whisper (very low flow) | -- | 0 | Down to Zero | 0 | 0 | No | No | No | Annual Test. 2 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403851907 | Form 17 | 7/3/2024 | 7/11/2024 | | 0 | NO FLOW | NONE | 0 | NO FLOW | 567 | 566 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
403631707 | Form 17 | 12/20/2023 | 12/20/2023 | SHUT-IN | 51 | DOWN TO 0 | GAS | 0 | NO FLOW | 588 | 588 | No | -- | -- | High Pressure Verification follow up test. 51 PSI gas flow blew down to 0 PSI in 3 seconds. No flow or pressure for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
403298138 | Form 17 | 1/19/2023 | 1/23/2023 | PLUNGER LIFT | 76 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 449 | 450 | Yes | -- | -- | Automation Alert follow-up test. 76 PSI gas flow blew down to 0 PSI within first few seconds of test through 1/2" needle valve. 1 cup of water on open then steady trickle for remainder of test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
Click for Specifics | Full | 10/20/2022 | 11/8/2022 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 409 | 410 | No | None | None | |
402846406 | Form 17 | 10/18/2021 | 10/19/2021 | PLUNGER LIFT | 11 | DOWN TO 0 | GAS | 0 | NO FLOW | 454 | 458 | No | -- | -- | Re-test after displacement and 44 day build up.
Gas on open for 15 seconds and died. No flow for remainder of test. |
402703910 | Form 17 | 5/19/2021 | 5/28/2021 | FLOWING | 50 | DOWN TO 0 | GAS | 0 | NO FLOW | 578 | 579 | Yes | Yes | No | Test per NTO. Gas at open. Gas sampled then reopened full. Gas for 10 seconds then dead for remainder of test. |
402556721 | Form 17 | 12/7/2020 | 12/17/2020 | PLUNGER LIFT | -- | NO FLOW | NONE | 0 | NO FLOW | 786 | 791 | No | -- | -- | Test after cat heater was removed and fluid pull was performed on 10/27/2020. Test after ~40 day buildup. |
402520995 | Form 17 | 10/27/2020 | 10/28/2020 | FLOWING | 97 | WATER H20 | -- | 0 | WATER H20 | 814 | 813 | Yes | -- | Yes | Test after cat heater mitigation. BH cut to water and cat heater mitigation will no longer be a viable option for mitigation.
Water on open, and intermittent trickle for duration of test. 1000 mL sample collected. Made ~ 2 gallons of water total. |
402260883 | Form 17 | 12/9/2019 | 12/11/2019 | FLOWING | 910 | CONTINUOUS | -- | 0 | CONTINUOUS | 2478 | 2478 | No | -- | -- | Test after DOFP. BH and Prod gas sample taken. Attempted to blow down thru 1/4" NV. BH PSI was 20 PSI after 15 minutes. Slightly above whisper at the end of test. ISIP 0 PSI. |
402182393 | Form 17 | 9/14/2019 | 9/19/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |