|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2025 Measured TD: 17871 ft. Vertical TD: 7669 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2025 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 6/6/2021 | Proposed Top PZ Location: | Sec:1 Twp: 1S 68W | Footage: 568 FNL 1248 FEL | Bottom Hole Location: | Sec:12 Twp: 1S 68W | Footage: 236 FSL 1226 FEL | Proposed Depth/Form: | 17735 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-2483 , Unit Acreage: 1280, Drill Unit: Sec. 1 & 12 ALL | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1700 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 707, Top: 0 ft., Bottom: 1700 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17735 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1774, Top: , Bottom: 17735 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6904 ft., Depth: 12424 ft., Weight: 13.5 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 8/29/2019 | Spud Date: | 7/1/2019 | Spud Date Is: | ACTUAL | Measured TD: | 17871 ft. | Measured PB depth: | 17862 ft. | True Vertical TD: | 7669 ft. | True Vertical PB depth: | 7669 ft. | Top PZ Location: | Sec:1 Twp: 1S 68W | Footage: 568 FNL 1248 FEL | Bottom Hole Location: | Sec:12 Twp: 1S 68W | Footage: 236 FSL 1226 FEL | Log Types: | CBL, Mud Log, MWD/LWD, (Composite in API# 001-09950) | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1774 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 800, Top: 0 ft., Bottom: 1757 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17871 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 2458, Top: 2544 ft., Bottom: 17871 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4433 ft. | 4523 ft. | N | N | SUSSEX | 4814 ft. | 4972 ft. | N | N | SHANNON | 5433 ft. | 5500 ft. | N | N | SHARON SPRINGS | 7753 ft. | | N | N | NIOBRARA | 7789 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 5/1/2025 Interval Top: 8330 ft. Interval Bottom: 17612 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 11/12/2019 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 9/26/2019 | Treatment End Date: | 10/20/2019 | Treatment Summary: | 2,457 bbls 15% HCL Acid; 753,689# 100 Mesh Sand; 8,547,070 # 20/40 Sand; 227,952 bbls Gelled Fluid; Flowback determined from well test separator | Total fluid used in treatment (bbls): | 230409 | Max pressure during treatment (psi): | 5072 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 62 | Total acid used in treatment (bbls): | 2457 | Min frac gradient (psi/ft): | 0.88 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 36483 | Fresh water used in treatment (bbls): | 227952 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 9300759 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7972 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/17/2019 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 857 | BBLS_OIL | 552 | BTU_GAS | 1387 | CALC_BBLS_H2O | 857 | CALC_BBLS_OIL | 552 | CALC_GOR | 1415 | CALC_MCF_GAS | 781 | CASING_PRESS | 1433 | GRAVITY_OIL | 45 | MCF_GAS | 781 | TUBING_PRESS | 2101 |
| Perforation Data: | Interval Top: | 8330 ft. | # Of Holes: | 1638 | Interval Bottom: | 17612 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 05/2024 - 04/2025 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|