| Off-Location Flowlines |
| Facility ID: 480882 | Operator Name: D90 ENERGY LLC | Status: AC |
| Operator Flowline ID: Big Horn to Pintail | Start Location ID: 446174 | Location: NESW 167N 80W |
| Flowline Type: Dump Line | Fluid Type: Produced Water | Pipe Material: HDPE | Construction Date: 7/20/2018 |
| |
| Facility ID: 480883 | Operator Name: D90 ENERGY LLC | Status: AC |
| Operator Flowline ID: Gregory Intersection to Pintail(Evans) | Start Location ID: 439603 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 11/12/2016 |
| |
| Facility ID: 477017 | Operator Name: D90 ENERGY LLC | Status: AC |
| Operator Flowline ID: Pintail446527 | Start Location ID: 438250 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |
| Facility ID: 480884 | Operator Name: D90 ENERGY LLC | Status: CL |
| Operator Flowline ID: Refuge to Mallard | Start Location ID: 0 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 10/6/2017 |
| |
| Facility ID: 480884 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: CL |
| Operator Flowline ID: Refuge to Mallard | Start Location ID: 0 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 10/6/2017 |
| |
| Facility ID: 477017 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC |
| Operator Flowline ID: Pintail446527 | Start Location ID: 438250 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |
| Facility ID: 480883 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC |
| Operator Flowline ID: Gregory Intersection to Pintail(Evans) | Start Location ID: 439603 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 11/12/2016 |
| |
| Facility ID: 480882 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC |
| Operator Flowline ID: Big Horn to Pintail | Start Location ID: 446174 | Location: NESW 167N 80W |
| Flowline Type: Dump Line | Fluid Type: Produced Water | Pipe Material: HDPE | Construction Date: 7/20/2018 |
| |
| Facility ID: 480883 | Operator Name: SANDRIDGE EXPLORATION & PRODUCTION LLC | Status: AC |
| Operator Flowline ID: Gregory Intersection to Pintail(Evans) | Start Location ID: 439603 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Natural Gas | Pipe Material: HDPE | Construction Date: 11/12/2016 |
| |
| Facility ID: 477017 | Operator Name: SANDRIDGE EXPLORATION & PRODUCTION LLC | Status: AC |
| Operator Flowline ID: Pintail446527 | Start Location ID: 438250 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |
| Facility ID: 480884 | Operator Name: SANDRIDGE EXPLORATION & PRODUCTION LLC | Status: CL |
| Operator Flowline ID: Refuge to Mallard | Start Location ID: 0 | Location: NESW 167N 80W |
| Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 10/6/2017 |
| |
| Facility ID: 480882 | Operator Name: SANDRIDGE EXPLORATION & PRODUCTION LLC | Status: AC |
| Operator Flowline ID: Big Horn to Pintail | Start Location ID: 446174 | Location: NESW 167N 80W |
| Flowline Type: Dump Line | Fluid Type: Produced Water | Pipe Material: HDPE | Construction Date: 7/20/2018 |
| |