|
| EVANS 0780 - #438250 Information | Status: AC - 12/1/2025 |
|
| Location ID: | 438250 | Location Name/No: | EVANS 0780/21 (Click Location Name for Water Production Data) | | Facility Status: | AC | Facility Status Date: | 12/1/2025 | | Operator Name: | FULCRUM ENERGY OPERATING LLC | Operator Number: | 10805 | | County: | JACKSON - #057 | Location: | NWNE 21 7N80W | | Facility Type: | LOCATION | Lat/Long: | 40.569537 / -106.376011 | | Basin: | NORTH PARK BASIN | | | | Form 2A Document #: | 401011921 | Form 2A Expiration: | 6/23/2019 |
|
| Location Inventory | | Wells: 4 | Oil Tanks: 0 | Condensate Tanks: 0 | Water Tanks: 0 | Buried Produced Water Vaults: 0 | | Drilling Pits: 0 | Production Pits: 0 | Special Purpose Pits: 0 | Multi-Well Pits: 0 | Modular Large Volume Tanks: 0 | | Pump Jacks: 4 | Separators: 4 | Injection Pumps: 0 | Heat-Treaters: 0 | Cavity Pumps: 0 | | Gas Compressors: 0 | Gas or Diesel Motors: 1 | Electric Motors: 0 | Electric Generators: 1 | Fuel Tanks: 0 | | LACT Unit: 0 | Dehydrator Units: 0 | Vapor Recovery Unit: 0 | VOC Combustor: 1 | Flare: 1 | | Enclosed Combustion Devices: 0 | Meter/Sales Building: 0 | Pigging Station: 0 | | Other: The production facilities (oil tanks, produced water tanks, heater-treaters) for this location will be located on the Ray Ranch 0780 16 pad, located approximately 2450' to the northwest of this pad; therefore, 4-inch schedule 40 steel produced water and oil pipelines will be run between the Evans well pad separators and the proposed well pad tank battery at the Ray Ranch 0780 16, Form 2A#401045070. Buried pipelilnes between wellheads and seperators will be 2-inch to 4-inch schedule 40 steel. |
|
| |
| Related Tank Facilities | | Sorry, no associated tank facilities could be found. |
|
| Related Pits | | Sorry, no associated pits could be found. |
|
|
| Off-Location Flowlines | | Facility ID: 477017 | Operator Name: FULCRUM ENERGY OPERATING LLC | Status: AC | | Operator Flowline ID: Pintail446527 | Start Location ID: 438250 | Location: NESW 167N 80W | | Flowline Type: Production Line | Fluid Type: Multiphase | Pipe Material: HDPE | Construction Date: 5/1/2019 |
| |
|
| Domestic Taps | | Sorry, no domestic taps could be found. |
|