Off-Location Flowlines |
Facility ID: 465035 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26L North Gas Lift Line | Start Location ID: 435421 | Location: NWSW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/2/2014 |
| |
Facility ID: 465036 | Operator Name: FUNDARE RESOURCES OPERATING COMPANY LLC | Status: AC |
Operator Flowline ID: Razor 26L South Gas Lift Line | Start Location ID: 435421 | Location: NWSW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/15/2014 |
| |
Facility ID: 465036 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Gas Lift Line | Start Location ID: 435421 | Location: NWSW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/15/2014 |
| |
Facility ID: 465030 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Test Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/15/2014 |
| |
Facility ID: 465010 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Bulk Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/15/2014 |
| |
Facility ID: 465035 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Gas Lift Line | Start Location ID: 435421 | Location: NWSW 2610N 58W |
Flowline Type: Peripheral Piping | Fluid Type: Natural Gas | Pipe Material: Carbon Steel | Construction Date: 11/2/2014 |
| |
Facility ID: 465023 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Bulk Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/23/2014 |
| |
Facility ID: 465027 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Blowdown Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/23/2014 |
| |
Facility ID: 465012 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L North Blowdown Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/15/2014 |
| |
Facility ID: 465020 | Operator Name: WHITING OIL & GAS CORPORATION | Status: AC |
Operator Flowline ID: Razor 26L South Test Production Line | Start Location ID: 434157 | Location: NESW 2610N 58W |
Flowline Type: Manifold Piping | Fluid Type: Multiphase | Pipe Material: Carbon Steel | Construction Date: 10/23/2014 |
| |