|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: STRT Status: AC - 8/1/2025 Measured TD: 20102 ft. Vertical TD: 20049 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: STRT AC - 8/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 2/9/2028 | | Proposed Top PZ Location: | Sec:2 Twp: 3N 66W | Footage: 2153 FSL 1472 FEL | | Bottom Hole Location: | Sec:2 Twp: 3N 66W | Footage: 2287 FSL 2376 FWL | | Proposed Depth/Form: | 20133 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | Not available | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: PCMB , Formation: PRECAMBRIAN , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 79 , Citings Type: PLANNED | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2350 ft., Weight: 54.5 , Citings Type: PLANNED | | Cement: | Sacks: 770, Top: 0 ft., Bottom: 2350 ft. | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 10624 ft., Weight: 47 , Citings Type: PLANNED | | Cement: | Sacks: 752, Top: 6600 ft., Bottom: 10624 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 6600 ft., Weight: 47 , Citings Type: PLANNED | | Cement: | Sacks: 1189, Top: 0 ft., Bottom: 6600 ft. | | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 10624 ft., Depth: 20133 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 4/28/2025 | | Spud Date: | 4/10/2025 | Spud Date Is: | ACTUAL | | Measured TD: | 20102 ft. | Measured PB depth: | 20102 ft. | | True Vertical TD: | 20049 ft. | True Vertical PB depth: | 20049 ft. | | Top PZ Location: | Sec:2 Twp: 3N 66W | Footage: 2141 FSL 1339 FEL | | Bottom Hole Location: | Sec:2 Twp: 3N 66W | Footage: 1984 FSL 2122 FEL | | Log Types: | CBL, Spectral GR, Resistivity, Density, Neutron, Sonic, Image Log, Spectral GR and Caliper
| | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL | | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 2356 ft., Weight: 54.50 , Citings Type: ACTUAL | | Cement: | Sacks: 1875, Top: 0 ft., Bottom: 2356 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 11020 ft., Weight: 47 , Citings Type: ACTUAL | | Cement: | Sacks: 2200, Top: 958 ft., Bottom: 11042 ft., Determination Method: CBL | | Casing: | String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 11042 ft., Depth: 20102 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: S.C. 1.1 , Top: 6597 ft., Depth: 11042 ft., Bottom: 11042 ft., Sacks: 935, Method: STAGE TOOL | | Additional Cement: | String Type: S.C. 1.2 , Top: 958 ft., Depth: 6597 ft., Bottom: 6597 ft., Sacks: 1265, Method: STAGE TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3904 ft. | | | | | SUSSEX | 4305 ft. | | | | | SHARON SPRINGS | 7012 ft. | | | | | NIOBRARA | 7057 ft. | | | | | CODELL | 7355 ft. | | | | | CARLILE | 7372 ft. | | | | | GREENHORN | 7418 ft. | | | | | GRANEROS | 7633 ft. | | | | | DAKOTA-JSND | 7795 ft. | | | | | MORRISON | 8102 ft. | | | | | ENTRADA | 8338 ft. | | | | | LYKINS | 8471 ft. | | | | | LYKINS | 8471 ft. | | | | | BLAINE | 8998 ft. | | | | | LYONS | 9049 ft. | | | | | LOWER SATANKA | 9215 ft. | | | | | WOLFCAMP | 9426 ft. | | | | | FOUNTAIN | 10093 ft. | | | | | PRECAMBRIAN | 10845 ft. | | | |
Formation PCMB Formation Classification: GEO-SC Status: AC - 12/17/2025 Interval Top: 11021 ft. Interval Bottom: 20102 ft.| Completed Information for Formation PRECAMBRIAN | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | PRECAMBRIAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation PCMB. |
| | Perforation Data: | | Interval Top: | 11021 ft. | # Of Holes: | 0 | | Interval Bottom: | 20102 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|