Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-52915GLADE
WEST
OXY USA INC
66561
AC
8/1/2025
NA / GEOTHERMAL
100000
WELD  123
NESE 2 3N66W 6
487829View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
GeothermalForm: (02)
404023513
01/27/2025
Significant lost circulation encountered during drilling will be reported as soon as practicable to the ECMC. Such notice will be provided on a Form 42, Field Operations Notice – Notice of Significant Lost Circulation. For instances of lost circulation encountered during drilling, tour sheets or drilling operations logs covering the time interval(s) where lost circulation was encountered will be attached to the Form 5 – Drilling Completion Report.
GeothermalForm: (02)
404023513
01/27/2025
Operator will Submit a Form 4-Notice of Intent requesting approval of any circulation of fluid in the production hole section for testing reasons prior to such operations.
GeothermalForm: (02)
404023513
02/05/2025
In accordance with Rule 1314.b.(1), Operator will run a pipe analysis log or caliper login in conjunction with any other logging requirements of Rule 408.r.
EngineerForm: (02)
404023513
02/05/2025
1) Submit Form 42 electronically to ECMC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad. 2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Sussex. Verify coverage with a cement bond log. 3) Oil based drilling fluid can only be used after all groundwater has been isolated.
EngineerForm: (02)
404023513
02/05/2025
Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release. 2) Annually as required by Rule 419.c.
EngineerForm: (04)
404185281
05/05/2025
Glade East experienced lost circulation at 11,042'. Operator is modifying cement design on the Glade West to prevent lost circulation.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
404023513
2/10/2025
Anti-Collision: Kerr-McGee will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within one hundred fifty (150) feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators within one hundred fifty (150) feet prior to drilling.
Drilling/Completion OperationsForm: (02 )
404023513
2/10/2025
In one of the two GLADE wells, Oxy plans to run CBL, Gamma Ray, Resistivity, Density, Neutron, and Sonic logs through the entire intermediate hole section, and an Image Log across the deepest 3000’ of the intermediate hole section. Additionally, Oxy plans to run Gamma Ray, Resistivity, Density, Neutron, Dipole Sonic, Image Log, and Spectroscopy logs through the entire production hole section. In the other GLADE well, Oxy plans to run CBL, Gamma Ray, Resistivity, Density, and Neutron logs in the intermediate section and Gamma Ray, Resistivity, Density, and Neutron logs in the production hole section. This logging program is subject to changes based on vendor and tool availability and hole conditions that may exceed logging tool limitations.