|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/15/2023 Measured TD: 22554 ft. Vertical TD: 7060 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/15/2023 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 9/6/2025 | Proposed Top PZ Location: | Sec:9 Twp: 3N 67W | Footage: 247 FNL 256 FWL | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 411 FNL 256 FEL | Proposed Depth/Form: | 22676 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-3375 , Unit Acreage: 1600, Drill Unit: T3N-R67W;09:N2,N2S2; | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 590, Top: 0 ft., Bottom: 1500 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 22666 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 2594, Top: , Bottom: 22666 ft. |
| | |
Wellbore Completed | Completion Date: | 3/22/2023 | Spud Date: | 11/14/2022 | Spud Date Is: | ACTUAL | Measured TD: | 22554 ft. | Measured PB depth: | 22496 ft. | True Vertical TD: | 7060 ft. | True Vertical PB depth: | 7063 ft. | Top PZ Location: | Sec:9 Twp: 3N 67W | Footage: 235 FNL 180 FWL | Bottom Hole Location: | Sec:11 Twp: 3N 67W | Footage: 422 N 257 E | Log Types: | CBL, MWD/LWD, CNL has been run on the Berry Farms 8-2HZ API 05-123-51858 | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 27 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1844 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 866, Top: 0 ft., Bottom: 1844 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 22543 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 2332, Top: 1802 ft., Bottom: 22554 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3589 ft. | | | | SUSSEX | 4077 ft. | | | | SHANNON | 4611 ft. | | | | SHARON SPRINGS | 7023 ft. | | | | NIOBRARA | 7117 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/15/2023 Interval Top: 7414 ft. Interval Bottom: 22413 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 7/24/2023 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | HYDRAULIC FRACTURING | Treatment Date: | 4/26/2023 | Treatment End Date: | 6/10/2023 | Treatment Summary: | 58 BBL 15% HCL ACID; 246 BBL 7.5% HCL ACID; 38,665 BBL PUMP DOWN; 623,419 BBL SLICKWATER; 662,388 BBL TOTAL FLUID; 21,970,450 LBS WHITE 40/70 OTTAWA/ST. PETERS; 21,970,450 LBS TOTAL PROPPANT.
| Total fluid used in treatment (bbls): | 662388 | Max pressure during treatment (psi): | 9016 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 56 | Total acid used in treatment (bbls): | 304 | Min frac gradient (psi/ft): | 0.95 | Recycled water used in treatment (bbls): | 9160 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 652924 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 21970450 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6977 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/8/2023 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 348 | BBLS_OIL | 877 | BTU_GAS | 1322 | CALC_BBLS_H2O | 348 | CALC_BBLS_OIL | 877 | CALC_GOR | 1893 | CALC_MCF_GAS | 1660 | CASING_PRESS | 2350 | GRAVITY_OIL | 55 | MCF_GAS | 1660 | TUBING_PRESS | 1900 |
| Perforation Data: | Interval Top: | 7414 ft. | # Of Holes: | 1683 | Interval Bottom: | 22413 ft. | Hole Size: | 0.39 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 135125 |
Total Gas Produced (MCF) | 1273372 |
GOR | 9423 |
GOR Determination | BOE |
Average BOE per Day | 968.467 |
Average MCFE per Day | 5617.121 |
Federal Financial Assurance | i | |
|
|