Engineer | Form: (02 ) 403097884 10/13/2022 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-18034FREAUFF #34-4A
123-18091PSC #43-11
123-19194HSR-PESCO #1-9A
123-15652FT ST VRAIN #23A
123-15651FORT SAINT VRAIN #21
123-10377FT ST VRAIN #9
123-10411BERRY #1
123-21633PSC #2-11
123-17958HSR-PESCO #4-11
123-21581PSC #3-9-5Y
123-31481BERRY P #08-27D
123-22781XCEL #14-10
123-21632PSC #15-11
123-24067PSC #27-11
123-24103PSC #39-11
123-25713PLATTE #35-2
123-19288HSR-BERRY #2-8
123-17925PSC #12-10A
123-18006PSC #22-11
123-24048PSC #37-11 |
Engineer | Form: (02 ) 403097884 10/13/2022 | Operator acknowledges the proximity of the non-operated well. Operator assures that this offset will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document Operator using Option 3. Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
123-19014PSC #31-10 |
Engineer | Form: (02 ) 403097884 10/13/2022 | Operator acknowledges the proximity of the listed non-operated wells. Operator assures that this offset list will be remediated per the Offset Well Evaluation and Hydraulic Fracturing Operator Guidance Document (option 4). Operator will submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation will be completed, during the hydraulic stimulation of this well. This Form 42 shall be filed 48 hours prior to stimulation. Operator will equip the well with at least a 5,000 psi wellhead and monitor casing (surface and production) pressures during the entire stimulation treatment. Surface and production casing pressures of this offset well list will be actively monitored during the entire stimulation treatment of this pad. If there is indication of communication between the stimulation treatment and an offset well, treatment will be stopped and COGCC Engineering notified.
123-21625PSC #15-10
123-23256PSC #2-10
123-24044PSC #24-11
123-15653FT ST VRAIN #24A
123-18317HSR-PSC #15-3
123-41355GOOSE #9N-A8HZ |
Engineer | Form: (02 ) 403097884 10/13/2022 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 2 business day spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j. and provide cement coverage from TD to a minimum of 500' above Niobrara. Verify coverage with a cement bond log. |
Engineer | Form: (02 ) 403097884 10/13/2022 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
2) If a delayed completion, a second test is required between 6-9 months after rig release and must be conducted prior to stimulation. If any pressure greater than 200 psi is observed or if there is continuous flow, Operator must contact COGCC engineering for approval prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
|
Permit | Form: (02 ) 403097884 10/25/2022 | If conductors are preset, operator shall comply with Notice to Operators: Procedures for Preset Conductors (dated September 1, 2016). |
Permit | Form: (02 ) 403097884 10/25/2022 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017). |