Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-50283
Well Classification: OW Status: PR - 4/15/2021
Well Name/No:GP Cody Fed #20E-15-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/15/2021
FacilityID:466167LocationID:332837
Municipality/County:GREELEY / WELD #123Location:NENE 20 5N65W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4673 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:706FNL  1305 FELLat/Long: 40.389920 / -104.682510Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.389922 / -104.682509Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/7/2021
End Date: 2/13/2021
Reported: 3/1/2021
Days to report: 16
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/15/2021             Measured TD: 14476 ft.    Vertical TD: 6972 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/15/2021
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/19/2021
Proposed Top PZ Location:Sec:20 Twp: 5N 65W Footage: 903 FNL  1635 FEL
Bottom Hole Location:Sec:22 Twp: 5N 65W Footage: 897 FNL  200 FWL
Proposed Depth/Form:14419 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14419 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1882, Top: , Bottom: 14419 ft.

Wellbore Completed
Completion Date:2/18/2020
Spud Date:1/4/2020Spud Date Is:ACTUAL
Measured TD:14476 ft.Measured PB depth:14424 ft.
True Vertical TD:6972 ft.True Vertical PB depth:6971 ft.
Top PZ Location:Sec:20 Twp: 5N 65WFootage: 902 FNL  1615 FEL
Bottom Hole Location:Sec:22 Twp: 5N 65WFootage: 886 FNL  199 FWL
Log Types:CBL, Mud Log, MWD/LWD, (Dual Induction on 123-24990).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1598 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 0 ft., Bottom: 1598 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14475 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2320, Top: 2500 ft., Bottom: 14476 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3725 ft.NN
SUSSEX4124 ft.NN
SHANNON4888 ft.NN
SHARON SPRINGS6871 ft.NN
NIOBRARA6893 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 4/15/2021                 Interval Top: 7379 ft.    Interval Bottom: 14376 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:4/2/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:2/7/2021Treatment End Date:2/13/2021
Treatment Summary:Frac'd Niobrara with 35 stage plug and perf; 81754 total bbls fluid pumped: 69850 bbls gelled fluid, 11844 bbls fresh water, and 60 bbls 28% HCl acid; 6999925 total lbs proppant pumped: 3499980 lbs 40/70 mesh and 3499945 lbs 30/50 mesh.
Total fluid used in treatment (bbls):81754Max pressure during treatment (psi):8638
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:35
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):7521
Fresh water used in treatment (bbls):11844Disposition method For flowback:DISPOSAL
Total proppant used (lbs):6999925Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7226 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/15/2021Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 206
BBLS_OIL 457
BTU_GAS 1297
CALC_BBLS_H2O 206
CALC_BBLS_OIL 457
CALC_GOR 5195
CALC_MCF_GAS 2374
CASING_PRESS 2392
GRAVITY_OIL 55
MCF_GAS 2374
TUBING_PRESS 1906
Perforation Data:
Interval Top:7379 ft.# Of Holes:1021
Interval Bottom:14376 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)5923
Total Gas Produced (MCF)116239
GOR19625
GOR DeterminationMCFE
Average BOE per Day71.129
Average MCFE per Day412.550

 Federal Financial Assurance  i 

 Tribal Well  i No