|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 8/1/2025 Measured TD: 13450 ft. Vertical TD: 6645 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 8/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 1/27/2021 | | Proposed Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 606 FSL 1071 FEL | | Bottom Hole Location: | Sec:34 Twp: 5N 64W | Footage: 198 FNL 1066 FEL | | Proposed Depth/Form: | 13455 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 920, Top: 0 ft., Bottom: 1600 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13455 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2035, Top: , Bottom: 13455 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/22/2021 | | Spud Date: | 11/16/2020 | Spud Date Is: | ACTUAL | | Measured TD: | 13450 ft. | Measured PB depth: | 13432 ft. | | True Vertical TD: | 6645 ft. | True Vertical PB depth: | 6645 ft. | | Top PZ Location: | Sec:22 Twp: 5N 64W | Footage: 606 FSL 1071 FEL | | Bottom Hole Location: | Sec:34 Twp: 5N 64W | Footage: 198 FNL 1066 FEL | | Log Types: | CBL, MWD (DIL in 123-49587) | | Log Types: | CBL, MWD (DIL in 123-49587) | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1691 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 540, Top: 0 ft., Bottom: 1691 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13446 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2118, Top: 0 ft., Bottom: 13446 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6340 ft., Depth: 6352 ft., Bottom: 6352 ft., Sacks: 10, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 6336 ft., Depth: 6351 ft., Bottom: 6351 ft., Sacks: 10, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 6126 ft., Depth: 6351 ft., Bottom: 6351 ft., Sacks: 15, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 5895 ft., Depth: 6343 ft., Bottom: 6343 ft., Sacks: 10, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 2284 ft., Depth: 2296 ft., Bottom: 2296 ft., Sacks: 10, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 1855 ft., Depth: 2296 ft., Bottom: 2296 ft., Sacks: 25, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | | | | | | PARKMAN | | | | | | SHARON SPRINGS | | | | | | SHANNON | | | | | | SUSSEX | | | | |
Formation NBRR Formation Classification: OW Status: PR - 8/1/2025 Interval Top: 7392 ft. Interval Bottom: 13446 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/11/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 7/14/2022 | Treatment End Date: | 7/20/2022 | | Treatment Summary: | 34 Stage Plug and Perf
Total Fluid: 118,566 bbls
Gel Fluid: 69,768 bbls
Slickwater Fluid: 48,298 bbls
15% HCl Acid: 500 bbls
Total Proppant: 5,484,880 lbs
Silica Proppant: 5,484,880 lbs
Method for determining flowback: Measuring flowback tank volumes. | | Total fluid used in treatment (bbls): | 118566 | Max pressure during treatment (psi): | 4577 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 34 | | Total acid used in treatment (bbls): | 500 | Min frac gradient (psi/ft): | 0.99 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 3878 | | Fresh water used in treatment (bbls): | 118066 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 5484880 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6885 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/14/2022 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 329 | | BBLS_OIL | 325 | | BTU_GAS | 1330 | | CALC_BBLS_H2O | 329 | | CALC_BBLS_OIL | 325 | | CALC_GOR | 2471 | | CALC_MCF_GAS | 803 | | CASING_PRESS | 2555 | | GRAVITY_OIL | 50 | | MCF_GAS | 803 | | TUBING_PRESS | 1539 |
| | Perforation Data: | | Interval Top: | 7392 ft. | # Of Holes: | 1204 | | Interval Bottom: | 13446 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 5548 |
| Total Gas Produced (MCF) | 114687 |
| GOR | 20671 |
| GOR Determination | MCFE |
| Average BOE per Day | 68.910 |
| Average MCFE per Day | 399.685 |
| Federal Financial Assurance | i | |
|
|