| Click for Specifics | Full | 4/22/2026 | 4/27/2026 | | 0 | No Flow | -- | 0 | No Flow | 475 | 422 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404292362 | Form 17 | 7/9/2025 | 7/24/2025 | PLUNGER LIFT | 0 | NO FLOW | NONE | 0 | NO FLOW | 588 | 587 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 7/19/2024 | 7/29/2024 | | 0 | No Flow | -- | 0 | No Flow | 649 | 649 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403620206 | Form 17 | 12/7/2023 | 12/11/2023 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 730 | 724 | No | -- | -- | Abatement system follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403387176 | Form 17 | 4/26/2023 | 4/27/2023 | FLOWING | 52 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 1025 | 1023 | Yes | -- | -- | Automation Alert test. 52 PSI water and gas flow blew down to 0 PSI in 5 minutes. No flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403149180 | Form 17 | 8/25/2022 | 8/29/2022 | FLOWING | 0 | DOWN TO 0 | GAS | 0 | NO FLOW | 2288 | 2289 | No | -- | -- | Post Production test within 60 days of first sales, 0 PSI no pressure or flow observed for the entire test. PDC will monitor bradenhead pressure monthly and submit annual test. |
| 403052613 | Form 17 | 5/17/2022 | 5/18/2022 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test. 0 PSI, no pressure or flow observed for the entire test. |
| 402983746 | Form 17 | 3/14/2022 | 3/14/2022 | SHUT-IN | 5 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Delayed Completions Test, 5 PSI blew down to 0 PSI in 5 minutes. No pressure or flow observed for the remainder of the test. |
| 402819964 | Form 17 | 8/23/2021 | 9/22/2021 | SHUT-IN | 173 | CONTINUOUS | GAS | 0 | NO FLOW | 0 | 0 | Yes | Yes | -- | Duc Test 173 PSI gas flow, blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC has collected a sample from this test and results will be submitted as soon as possible. PDC has scheduled another sampling event scheduled for september 30th. |
| 402720916 | Form 17 | 6/14/2021 | 6/16/2021 | | 255 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | Yes | -- | -- | Delayed Completions Test, 0 PSI no pressure or flow observed for the entire 30 minute test. This well is currently on abatement system to mitigate bradenhead pressure. |
| 402765800 | Form 17 | 3/31/2021 | 7/30/2021 | SHUT-IN | 0 | NO FLOW | -- | 0 | | 0 | 0 | No | -- | -- | Delayed Completions Test, 0 PSI No pressure or flow observed for the entire test. |