|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 9/1/2020 Measured TD: 17846 ft. Vertical TD: 7308 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 9/1/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/22/2020 | | Proposed Top PZ Location: | Sec:17 Twp: 2N 68W | Footage: 481 FSL 1786 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 68W | Footage: 512 FNL 1718 FWL | | Proposed Depth/Form: | 17738 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-1968 , Unit Acreage: 1280, Drill Unit: S8:All & S17:All | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1500 ft. | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17738 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 2366, Top: , Bottom: 17738 ft. |
| | |
| Wellbore Completed | | Completion Date: | 7/29/2018 | | Spud Date: | 7/6/2018 | Spud Date Is: | ACTUAL | | Measured TD: | 17846 ft. | Measured PB depth: | 17828 ft. | | True Vertical TD: | 7308 ft. | True Vertical PB depth: | 7309 ft. | | Top PZ Location: | Sec:17 Twp: 2N 68W | Footage: 481 FSL 1786 FWL | | Bottom Hole Location: | Sec:8 Twp: 2N 68W | Footage: 512 FNL 1718 FWL | | Log Types: | CBL, Mud, MWD/LWD, (Triple Combo on 123-47175). | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1619 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 550, Top: 0 ft., Bottom: 1619 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17828 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2830, Top: 260 ft., Bottom: 17828 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 4042 ft. | | N | N | | SUSSEX | 4560 ft. | | N | N | | SHANNON | 5168 ft. | | N | N | | SHARON SPRINGS | 7666 ft. | | N | N | | NIOBRARA | 7798 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 9/1/2020 Interval Top: 8232 ft. Interval Bottom: 17776 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/30/2018 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/29/2018 | Treatment End Date: | 10/10/2018 | | Treatment Summary: | Frac'd Niobrara with 48-stage plug-and-perf;
20161 total bbls fluid pumped: 20009 bbls fresh water and 152 bbls 28% HCl acid;
14400290 total lbs proppant pumped: 7200270 lbs 40/70 mesh and 7200020 lbs 30/50 mesh. | | Total fluid used in treatment (bbls): | 20161 | Max pressure during treatment (psi): | 9177 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 48 | | Total acid used in treatment (bbls): | 152 | Min frac gradient (psi/ft): | 0.87 | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 10304 | | Fresh water used in treatment (bbls): | 20009 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 14400290 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8131 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/15/2019 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 389 | | BBLS_OIL | 294 | | BTU_GAS | 1366 | | CALC_BBLS_H2O | 389 | | CALC_BBLS_OIL | 294 | | CALC_GOR | 3636 | | CALC_MCF_GAS | 1069 | | CASING_PRESS | 2597 | | GRAVITY_OIL | 48 | | MCF_GAS | 1069 | | TUBING_PRESS | 1673 |
| | Perforation Data: | | Interval Top: | 8232 ft. | # Of Holes: | 1129 | | Interval Bottom: | 17776 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 3644 |
| Total Gas Produced (MCF) | 68566 |
| GOR | 18816 |
| GOR Determination | MCFE |
| Average BOE per Day | 42.386 |
| Average MCFE per Day | 245.820 |
| Federal Financial Assurance | i | |
|
|