Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46697
Well Classification: OW Status: PR - 3/1/2025
Well Name/No:J Clark #9C
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2025
FacilityID:454708LocationID:323242
County:WELD #123Location:NWNE 14 5N65W 6
Field:WATTENBERG - #90750Elevation:4616 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:550FNL  2054 FELLat/Long: 40.405169 / -104.628458Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.405170 / -104.628460Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/20/2018
End Date: 10/25/2018
Reported: 2/1/2022
Originally Reported: 11/21/2018
Days to report: 1195
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 3/1/2025             Measured TD: 12226 ft.    Vertical TD: 6917 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 3/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:4/4/2020
Proposed Top PZ Location:Sec:11 Twp: 5N 65W Footage: 229 FSL  2296 FWL
Bottom Hole Location:Sec:11 Twp: 5N 65W Footage: 500 FNL  2306 FWL
Proposed Depth/Form:12259 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 400, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1600 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12259 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 12259 ft.

Wellbore Completed
Completion Date:7/24/2018
Spud Date:7/18/2018Spud Date Is:ACTUAL
Measured TD:12226 ft.Measured PB depth:12203 ft.
True Vertical TD:6917 ft.True Vertical PB depth:6918 ft.
Top PZ Location:Sec:11 Twp: 5N 65WFootage: 229 FSL  2296 FWL
Bottom Hole Location:Sec:11 Twp: 5N 65WFootage: 500 FNL  2306 FWL
Log Types:CBL, MWD (DIL in 123-12759)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1677 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 1677 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12219 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1598, Top: 2480 ft., Bottom: 12226 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3586 ft.
SUSSEX4271 ft.
SHANNON4973 ft.
SHARON SPRINGS6681 ft.
NIOBRARA6733 ft.
FORT HAYS7229 ft.
CODELL7439 ft.
CARLILE10168 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 11/1/2019                 Interval Top: 10168 ft.    Interval Bottom: 10815 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/1/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 10,168'-10,316', 10,706'-10,815'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:10168 ft.# Of Holes:684
Interval Bottom:10815 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 11/1/2019                 Interval Top: 8082 ft.    Interval Bottom: 12094 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/1/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,082'-9,533', 11,711'-12,094'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8082 ft.# Of Holes:684
Interval Bottom:12094 ft.Hole Size:0.42 in.

Formation CLCDFH                 Formation Classification:  OW                 Status:  PR - 3/1/2025                  Interval Top: 7619 ft.    Interval Bottom: 12219 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:12/3/2018Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/20/2018Treatment End Date:10/25/2018
Treatment Summary:20 Stage Plug and Perf Total Fluid: 72,871 bbls Gel Fluid: 53,664 bbls Slickwater Fluid: 18,649 bbls 15% HCl Acid: 558 bbls Total Proppant: 3,872,840 lbs Silica Proppant: 3,872,840 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):72871Max pressure during treatment (psi):4336
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):558Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):4251
Fresh water used in treatment (bbls):72313Disposition method For flowback:DISPOSAL
Total proppant used (lbs):3872840Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7059 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/9/2018Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BBLS_OIL 216
BTU_GAS 1251
CALC_BBLS_H2O 120
CALC_BBLS_OIL 216
CALC_GOR 4199
CALC_MCF_GAS 907
CASING_PRESS 2013
GRAVITY_OIL 47
MCF_GAS 907
TUBING_PRESS 1321
Perforation Data:
Interval Top:7619 ft.# Of Holes:684
Interval Bottom:12219 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 11/1/2019                 Interval Top: 7619 ft.    Interval Bottom: 12219 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:11/1/2019Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,619'-8,082', 9,533'-10,168', 10,316'-10,706', 10,815'-11,711', 12,094'-12,219'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7619 ft.# Of Holes:684
Interval Bottom:12219 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1711
Total Gas Produced (MCF)14304
GOR8360
GOR DeterminationBOE
Average BOE per Day11.443
Average MCFE per Day66.375

 Federal Financial Assurance  i 

 Tribal Well  i No