Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-46568
Well Classification: OW Status: PR - 9/1/2024
Well Name/No:Ruegge #3R-4H-N165
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/1/2024
FacilityID:454449LocationID:331527
County:WELD #123Location:SESW 4 1N65W 6
Field:DJ HORIZONTAL CODELL - #16948Elevation:4914 ft.
Planned Location:717FSL  2205 FWLLat/Long: 40.075285 / -104.670526Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.075276 / -104.670520Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/3/2018
End Date: 9/13/2018
Reported: 6/7/2019
Originally Reported: 3/20/2019
Days to report: 267
Days to report: 188
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 9/1/2024             Measured TD: 12660 ft.    Vertical TD: 7215 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 9/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/20/2020
Proposed Top PZ Location:Sec:4 Twp: 1N 65W Footage: 455 FSL  214 FEL
Bottom Hole Location:Sec:4 Twp: 1N 65W Footage: 465 FNL  221 FEL
Proposed Depth/Form:12745 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CD-FH , Formation: CODELL-FORT HAYS , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 98 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 78, Top: 0 ft., Bottom: 98 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2546 ft., Weight: 40 , Citings Type: PLANNED
Cement:Sacks: 976, Top: 0 ft., Bottom: 2546 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12745 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 1738, Top: , Bottom: 12745 ft.

Wellbore Completed
Completion Date:7/30/2018
Spud Date:5/18/2018Spud Date Is:ACTUAL
Measured TD:12660 ft.Measured PB depth:12617 ft.
True Vertical TD:7215 ft.True Vertical PB depth:7218 ft.
Top PZ Location:Sec:4 Twp: 1N 65WFootage: 455 FSL  214 FEL
Bottom Hole Location:Sec:4 Twp: 1N 65WFootage: 465 N  221 E
Log Types:MUD, MWD/LWD, CBL (DIL in 123-20848)
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 121 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 72, Top: 0 ft., Bottom: 121 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2563 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 976, Top: 0 ft., Bottom: 2695 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 12640 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 1689, Top: 3059 ft., Bottom: 12660 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4758 ft.NN
SHANNON5603 ft.NN
TEEPEE BUTTES6769 ft.NN
SHARON SPRINGS7524 ft.NN
NIOBRARA7555 ft.NN
FORT HAYS8214 ft.NN
CODELL8421 ft.NN

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/23/2020                 Interval Top: 8421 ft.    Interval Bottom: 11786 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2020Treatment End Date:N/A
Treatment Summary:Codell: 8421'-11786'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:8421 ft.# Of Holes:336
Interval Bottom:11786 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 11/1/2024                 Interval Top: 8261 ft.    Interval Bottom: 12614 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:11/10/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/3/2018Treatment End Date:9/13/2018
Treatment Summary:93198 bbls of water, 85 bbls of additives (FRP-4CS, PLEXSLICK 986C, ACI-97, ASF-67) and 12 bbl HCL in a 15 stage frac with 2286380 lbs of silica quartz proppant
Total fluid used in treatment (bbls):93295Max pressure during treatment (psi):8979
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:15
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):9957
Fresh water used in treatment (bbls):93283Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2286380Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7778 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/9/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 379
BBLS_OIL 501
BTU_GAS 1322
CALC_BBLS_H2O 379
CALC_BBLS_OIL 501
CALC_GOR 1232
CALC_MCF_GAS 617
CASING_PRESS 2320
GRAVITY_OIL 43
MCF_GAS 617
TUBING_PRESS 1150
Perforation Data:
Interval Top:8261 ft.# Of Holes:336
Interval Bottom:12614 ft.Hole Size:0.42 in.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 7/23/2020                 Interval Top: 8261 ft.    Interval Bottom: 12614 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:7/23/2020Treatment End Date:N/A
Treatment Summary:8261'-8420', 11787'-12614'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:8261 ft.# Of Holes:336
Interval Bottom:12614 ft.Hole Size:0.42 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2023 - 11/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)281
GOR10035
GOR DeterminationBOE
Average BOE per Day0.209
Average MCFE per Day1.220

 Federal Financial Assurance  i 

 Tribal Well  i No