Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45987
Well Classification: OW Status: PR - 1/1/2023
Well Name/No:Coyote Trails #34S-20-15N
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:EXTRACTION OIL & GAS INC - 10459
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2023
FacilityID:453227LocationID:319094
County:WELD #123Location:SWSE 28 1N68W 6
Field:WATTENBERG - #90750Elevation:5273 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1145FSL  2049 FELLat/Long: 40.017973 / -105.006382Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.017973 / -105.006381Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/25/2018
End Date: 6/5/2018
Reported: 6/25/2018
Days to report: 20
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2023             Measured TD: 19495 ft.    Vertical TD: 8170 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:11/29/2019
Proposed Top PZ Location:Sec:34 Twp: 1N 68W Footage: 479 FNL  2051 FWL
Bottom Hole Location:Sec:3 Twp: 1S 68W Footage: 191 FSL  1638 FWL
Proposed Depth/Form:19235 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2208 , Unit Acreage: 1360, Drill Unit: sec: 33, 34, 3, 4
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 400, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19235 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2584, Top: 1500 ft., Bottom: 19235 ft.

Wellbore Completed
Completion Date:3/20/2018
Spud Date:2/4/2018Spud Date Is:ACTUAL
Measured TD:19495 ft.Measured PB depth:19488 ft.
True Vertical TD:8170 ft.True Vertical PB depth:8170 ft.
Top PZ Location:Sec:34 Twp: 1N 68WFootage: 479 FNL  2051 FWL
Bottom Hole Location:Sec:3 Twp: 1S 68WFootage: 191 FSL  1638 FWL
Log Types:CBL, Mud, MWD/LWD, (Triple Combo on 123-45991).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1606 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 1606 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 19488 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 3065, Top: 1360 ft., Bottom: 19488 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN5449 ft.NN
SUSSEX5960 ft.NN
SHANNON6579 ft.NN
SHARON SPRINGS9017 ft.NN
NIOBRARA9059 ft.NN
FORT HAYS9586 ft.NN
CODELL9674 ft.NN

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 10/24/2018                Interval Top: 13533 ft.    Interval Bottom: 16193 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:9/30/2018Choke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/6/2018
Treatment Summary:Producing Intervals: 13533'-13979'; 15831-16193'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:13533 ft.# Of Holes:140
Interval Bottom:16193 ft.Hole Size:0.42 in.

Formation CD-FH                   Formation Classification:  OW                   Status:  PR - 1/1/2023                  Interval Top: 9870 ft.    Interval Bottom: 19385 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:9/30/2018Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/6/2018
Treatment Summary:Frac'd Codell-Fort Hays with 49-stage plug-and-perf; 9799900 total proppant pumped: 30/50 mesh sand; 20142 total bbls fluid pumped: 20130 bbls fresh water and 12 bbls 15% HCL acid.
Total fluid used in treatment (bbls):20142Max pressure during treatment (psi):8309
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:49
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.79
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):33128
Fresh water used in treatment (bbls):20130Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9799900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9716 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/11/2018Test Method:flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 192
BBLS_OIL 652
BTU_GAS 1530
CALC_BBLS_H2O 192
CALC_BBLS_OIL 652
CALC_GOR 2451
CALC_MCF_GAS 1598
CASING_PRESS 2744
GRAVITY_OIL 46
MCF_GAS 1598
TUBING_PRESS 1740
Perforation Data:
Interval Top:9870 ft.# Of Holes:1537
Interval Bottom:19385 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 10/24/2018                Interval Top: 9870 ft.    Interval Bottom: 19385 ft.

 Completed Information for Formation CODELL
1st Production Date:9/30/2018Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/25/2018Treatment End Date:6/6/2018
Treatment Summary:Producing Intervals: 9870'-13510'; 14000'-15797'; 16230'-19385'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:9870 ft.# Of Holes:1397
Interval Bottom:19385 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)4678
Total Gas Produced (MCF)125088
GOR26739
GOR DeterminationMCFE
Average BOE per Day71.838
Average MCFE per Day416.674

 Federal Financial Assurance  i 

 Tribal Well  i No