Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45450
Well Classification: OW Status: PR - 1/1/2026
Well Name/No:Wilson IC #03-299HNX
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:452193LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4986 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1276FNL  630 FWLLat/Long: 40.259347 / -104.958492Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259349 / -104.958491Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/2/2019
End Date: 7/21/2019
Reported: 8/9/2019
Days to report: 19
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2026             Measured TD: 15617 ft.    Vertical TD: 7062 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 1525 FSL  568 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 1495 FSL  2616 FWL
Proposed Depth/Form:17695 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17795 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2272, Top: 0 ft., Bottom: 17795 ft.

Wellbore Completed
Completion Date:5/28/2019
Spud Date:2/4/2019Spud Date Is:ACTUAL
Measured TD:15617 ft.Measured PB depth:14448 ft.
True Vertical TD:7062 ft.True Vertical PB depth:7062 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 1525 FSL  568 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 1495 FSL  2616 FWL
Log Types:Mud, MWD/LWD, CBL, Formation MicroScan, Tracer Survey (Composite in 123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1592 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 719, Top: 0 ft., Bottom: 1592 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14458 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1651, Top: 5870 ft., Bottom: 14458 ft., Determination Method: CBL
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 14458 ft., Depth: 15617 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3771 ft.3838 ft.NN
SUSSEX4356 ft.4531 ft.NN
SHANNON4940 ft.4981 ft.NN
SHARON SPRINGS7525 ft.NN
NIOBRARA7813 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2026                  Interval Top: 8212 ft.    Interval Bottom: 14162 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:9/20/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/2/2019Treatment End Date:7/21/2019
Treatment Summary:852 bbls 15% HCL Acid; 495,625# 100 Mesh Sand; 5,430,952# 20/40 Sand; 130,695 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):131547Max pressure during treatment (psi):4284
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:40
Total acid used in treatment (bbls):852Min frac gradient (psi/ft):0.93
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):14161
Fresh water used in treatment (bbls):130695Disposition method For flowback:DISPOSAL
Total proppant used (lbs):5926577Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7328 ft.
Tubing Packer Depth:7310 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/24/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 221
BBLS_OIL 517
BTU_GAS 1393
CALC_BBLS_H2O 221
CALC_BBLS_OIL 517
CALC_GOR 2087
CALC_MCF_GAS 1079
CASING_PRESS 50
GRAVITY_OIL 46
MCF_GAS 1079
TUBING_PRESS 1223
Perforation Data:
Interval Top:8212 ft.# Of Holes:1040
Interval Bottom:14162 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)495
Total Gas Produced (MCF)22416
GOR45284
GOR DeterminationMCFE
Average BOE per Day11.813
Average MCFE per Day68.516

 Federal Financial Assurance  i 

 Tribal Well  i No