| 404413547 | Form 17 | 10/22/2025 | 10/29/2025 | PLUNGER LIFT | 44 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 281 | 275 | No | -- | -- | Remediation follow up test. 44 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/21/2025 | 6/5/2025 | | 36 | Continuous | -- | 0 | No Flow | 610 | 608 | No | No | No | Annual Test. 36 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403985396 | Form 17 | 10/30/2024 | 11/6/2024 | | 5 | DOWN TO 0 | GAS | 0 | NO FLOW | 564 | 565 | No | -- | -- | Remediation follow up test. 5 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 5/22/2024 | 6/4/2024 | | 0 | Down to Zero | -- | 0 | Down to Zero | 462 | 462 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403416535 | Form 17 | 5/25/2023 | 5/31/2023 | PLUNGER LIFT | 50 | DOWN TO 0 | GAS | 0 | NO FLOW | 552 | 555 | Yes | -- | -- | Annual Test. 50 PSI gas blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 8/16/2022 | 9/6/2022 | | 23 | Down to Zero | -- | 0 | Down to Zero | 463 | 462 | No | None | None | |
| 402808121 | Form 17 | 9/2/2021 | 9/11/2021 | PLUNGER LIFT | 32 | WHISPER | GAS | 0 | NO FLOW | 321 | 313 | No | -- | -- | Test per NTO. Whisper on open for 12 seconds and died. No flow for remainder of test. |
| 402546993 | Form 17 | 11/25/2020 | 12/4/2020 | PLUNGER LIFT | 13 | CONTINUOUS | GAS | 0 | NO FLOW | 642 | 641 | No | -- | -- | Test per 2020 NTO. Gas on open for 20 seconds and died. No flow for the remainder of the test. |
| 402255845 | Form 17 | 12/4/2019 | 12/5/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 535 | 537 | No | -- | -- | Test after DOFP. Vacuum on open, died instantly. Well turned on at ~ 25 minute mark.
|
| 402071391 | Form 17 | 6/2/2019 | 6/11/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe-prep/frac. |