Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45444
Well Classification: OW Status: SI - 11/1/2025
Well Name/No:Wilson IC #03-222HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/1/2025
FacilityID:452187LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4984 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1277FNL  705 FWLLat/Long: 40.259347 / -104.958222Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259350 / -104.958223Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/29/2019
End Date: 7/16/2019
Reported: 8/9/2019
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 11/1/2025             Measured TD: 17915 ft.    Vertical TD: 7182 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 11/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 2409 FSL  529 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 2298 FSL  230 FWL
Proposed Depth/Form:17611 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17711 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2264, Top: , Bottom: 17711 ft.

Wellbore Completed
Completion Date:4/3/2019
Spud Date:1/3/2019Spud Date Is:ACTUAL
Measured TD:17915 ft.Measured PB depth:17906 ft.
True Vertical TD:7182 ft.True Vertical PB depth:7182 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 2409 FSL  529 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 2298 FSL  230 FWL
Log Types:Mud, MWD/LWD, CBL, Formation MicroScan, Tracer Survey (Composite in 123-45441)
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1588 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 735, Top: 0 ft., Bottom: 1588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17915 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1995, Top: 4250 ft., Bottom: 17915 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3689 ft.3716 ft.NN
SUSSEX4153 ft.4322 ft.NN
SHANNON4721 ft.4756 ft.NN
SHARON SPRINGS7289 ft.NN
NIOBRARA7504 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 11/1/2025                 Interval Top: 8074 ft.    Interval Bottom: 17626 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/30/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/29/2019Treatment End Date:7/16/2019
Treatment Summary:2,190 bbls 15% HCL Acid; 774,610# 100 Mesh Sand; 8,835,495# 20/40 Sand; 219,648 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):221838Max pressure during treatment (psi):4938
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):2190Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):13050
Fresh water used in treatment (bbls):219648Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9610105Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7743 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/6/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 563
BBLS_OIL 362
BTU_GAS 1393
CALC_BBLS_H2O 563
CALC_BBLS_OIL 362
CALC_GOR 1251
CALC_MCF_GAS 453
CASING_PRESS 1750
GRAVITY_OIL 46
MCF_GAS 453
TUBING_PRESS 1150
Perforation Data:
Interval Top:8074 ft.# Of Holes:1664
Interval Bottom:17626 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)1558
Total Gas Produced (MCF)9540
GOR6123
GOR DeterminationBOE
Average BOE per Day8.706
Average MCFE per Day50.510

 Federal Financial Assurance  i 

 Tribal Well  i No