Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-45430
Well Classification: OW Status: PR - 1/1/2026
Well Name/No:Wilson IC #03-142HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:452172LocationID:452180
County:WELD #123Location:NWNW 1 3N68W 6
Field:WATTENBERG - #90750Elevation:4985 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1176FNL  675 FWLLat/Long: 40.259622 / -104.958328Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.259622 / -104.958329Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/8/2019
End Date: 6/24/2019
Reported: 7/16/2019
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 1/1/2026             Measured TD: 17601 ft.    Vertical TD: 7116 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 1/1/2026
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:9/16/2019
Proposed Top PZ Location:Sec:2 Twp: 3N 68W Footage: 2003 FNL  528 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68W Footage: 2036 FNL  239 FWL
Proposed Depth/Form:17327 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 1280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 624, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17427 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2231, Top: , Bottom: 17427 ft.

Wellbore Completed
Completion Date:5/15/2019
Spud Date:12/30/2018Spud Date Is:ACTUAL
Measured TD:17601 ft.Measured PB depth:17592 ft.
True Vertical TD:7116 ft.True Vertical PB depth:7116 ft.
Top PZ Location:Sec:2 Twp: 3N 68WFootage: 2003 FNL  528 FEL
Bottom Hole Location:Sec:3 Twp: 3N 68WFootage: 2036 FNL  239 FWL
Log Types:Mud, MWD/LWD, CBL (Composite in 123-45441)
Log Types:USIT
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1569 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 723, Top: 0 ft., Bottom: 1569 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 17601 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1950, Top: 5430 ft., Bottom: 17601 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4630 ft., Depth: 4671 ft., Bottom: 4700 ft., Sacks: 40, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 3735 ft., Depth: 3782 ft., Bottom: 3804 ft., Sacks: 250, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
PARKMAN3669 ft.3705 ft.NN
SUSSEX4132 ft.4287 ft.NN
SHANNON4642 ft.4677 ft.NN
SHARON SPRINGS7099 ft.NN
NIOBRARA7320 ft.NN

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 1/1/2026                  Interval Top: 7763 ft.    Interval Bottom: 17315 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/12/2019Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/8/2019Treatment End Date:6/24/2019
Treatment Summary:2,000 bbls 15% HCL Acid; 773,975# 100 Mesh Sand; 8,841,610# 20/40 Sand; 210,346 bbls Gelled Fluid; Flowback determined from well test separator
Total fluid used in treatment (bbls):212346Max pressure during treatment (psi):4968
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:64
Total acid used in treatment (bbls):2000Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):23485
Fresh water used in treatment (bbls):210346Disposition method For flowback:DISPOSAL
Total proppant used (lbs):9615585Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7426 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/23/2019Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 726
BBLS_OIL 455
BTU_GAS 1393
CALC_BBLS_H2O 726
CALC_BBLS_OIL 455
CALC_GOR 1596
CALC_MCF_GAS 726
CASING_PRESS 1850
GRAVITY_OIL 46
MCF_GAS 726
TUBING_PRESS 1400
Perforation Data:
Interval Top:7763 ft.# Of Holes:1664
Interval Bottom:17315 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)2382
Total Gas Produced (MCF)80753
GOR33901
GOR DeterminationMCFE
Average BOE per Day44.721
Average MCFE per Day259.384

 Federal Financial Assurance  i 

 Tribal Well  i No