|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/26/2021 Measured TD: 13597 ft. Vertical TD: 6311 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/26/2021 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 2/6/2020 | Proposed Top PZ Location: | Sec:31 Twp: 9N 59W | Footage: 1013 FNL 2074 FEL | Bottom Hole Location: | Sec:32 Twp: 9N 59W | Footage: 1007 FNL 471 FEL | Proposed Depth/Form: | 13598 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-734 , Unit Acreage: 960, Drill Unit: S31 E2; S32 All | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-734 , Unit Acreage: 960, Drill Unit: S 31: E/2, S 32: All | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 70 ft., Weight: 43 , Citings Type: PLANNED | Cement: | Sacks: 50, Top: 0 ft., Bottom: 70 ft. | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1550 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 585, Top: 0 ft., Bottom: 1550 ft. | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13587 ft., Weight: 20 , Citings Type: PLANNED | Cement: | Sacks: 2125, Top: 0 ft., Bottom: 13587 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6567 ft., Depth: 13613 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 525, Top: 6567 ft., Bottom: 13613 ft. |
| | |
Wellbore Completed | Completion Date: | 3/11/2018 | Spud Date: | 2/16/2018 | Spud Date Is: | ACTUAL | Measured TD: | 13597 ft. | Measured PB depth: | 13597 ft. | True Vertical TD: | 6311 ft. | True Vertical PB depth: | 6311 ft. | Top PZ Location: | Sec:31 Twp: 9N 59W | Footage: 1013 FNL 2074 FEL | Bottom Hole Location: | Sec:32 Twp: 9N 59W | Footage: 1007 N 471 E | Log Types: | Mud Log, MWD/LWD, CBL, Triple Combination | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 43 , Citings Type: ACTUAL | Cement: | Sacks: 50, Top: 0 ft., Bottom: 70 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1619 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 585, Top: 0 ft., Bottom: 1619 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13597 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: 2180, Top: 240 ft., Bottom: 13597 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3492 ft. | | | | SUSSEX | 4216 ft. | | | | SHANNON | 4636 ft. | | | | SHARON SPRINGS | 6015 ft. | | | | NIOBRARA | 6084 ft. | | | | FORT HAYS | 6620 ft. | | | | CODELL | 6845 ft. | | | |
Formation CODL Formation Classification: OW Status: CM - 9/5/2019 Interval Top: 6933 ft. Interval Bottom: 13567 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/5/2019 | Treatment End Date: | N/A | Treatment Summary: | Codell - 6933'-13567' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 6933 ft. | # Of Holes: | 1320 | Interval Bottom: | 13567 ft. | Hole Size: | 0.42 in. |
|
Formation CD-FH Formation Classification: OW Status: PR - 10/26/2021 Interval Top: 6733 ft. Interval Bottom: 13567 ft. Completed Information for Formation CODELL-FORT HAYS | 1st Production Date: | 6/1/2018 | Choke Size: | | Formation Name: | CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 10/18/2021 | Treatment End Date: | 10/18/2021 | Treatment Summary: | Production Enhancement Matrix Job - 3450 gal of Kairo Acid Pkg (K-CID 4001-50), 1150 gal 15% HCl Acid, 6011 bbls Production Enhancement fluid. Job was pumped down 2-3/8'' tubing. | Total fluid used in treatment (bbls): | 6121 | Max pressure during treatment (psi): | 4610 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.34 | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 110 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 6011 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/3/2018 | Treatment End Date: | 4/17/2018 | Treatment Summary: | Codell frac'd w/ 238,199 lbs of 100 mesh and 10,068,289 lbs of 40/70, 212,653 bbls of Slickwater, and 11,000 gal of 7.5% HCl acid | Total fluid used in treatment (bbls): | 212653 | Max pressure during treatment (psi): | 8254 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.33 | Type Of gas: | | Number Of staged intervals: | 46 | Total acid used in treatment (bbls): | 262 | Min frac gradient (psi/ft): | 0.78 | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 23136 | Fresh water used in treatment (bbls): | 212653 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 10306488 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6384 ft. | Tubing Packer Depth: | 6375 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 819 | BBLS_OIL | 633 | BTU_GAS | 1513 | CALC_BBLS_H2O | 819 | CALC_BBLS_OIL | 633 | CALC_GOR | 450 | CALC_MCF_GAS | 285 | CASING_PRESS | 6 | GRAVITY_OIL | 35 | MCF_GAS | 285 | TUBING_PRESS | 392 |
| Perforation Data: | Interval Top: | 6733 ft. | # Of Holes: | 1350 | Interval Bottom: | 13567 ft. | Hole Size: | 0.42 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 9/5/2019 Interval Top: 6733 ft. Interval Bottom: 6894 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | | Treatment Date: | 9/5/2019 | Treatment End Date: | N/A | Treatment Summary: | Fort Hays - 6733'-6894' | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 6733 ft. | # Of Holes: | 30 | Interval Bottom: | 6894 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 9414 |
Total Gas Produced (MCF) | 16907 |
GOR | 1795 |
GOR Determination | BOE |
Average BOE per Day | 33.674 |
Average MCFE per Day | 195.295 |
Federal Financial Assurance | i | Y |
|
|