|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 5/1/2022 Measured TD: 15076 ft. Vertical TD: 7583 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 5/1/2022 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 8/6/2018 | Proposed Top PZ Location: | Sec:22 Twp: 1N 67W | Footage: 1768 FNL 958 FEL | Bottom Hole Location: | Sec:10 Twp: 1N 67W | Footage: 800 FSL 877 FEL | Proposed Depth/Form: | 15904 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 560, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 710, Top: 0 ft., Bottom: 1800 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15894 ft., Weight: 17 , Citings Type: PLANNED | Cement: | Sacks: 1877, Top: , Bottom: 15894 ft. |
| | |
Wellbore Completed | Completion Date: | 10/30/2017 | Spud Date: | 8/25/2017 | Spud Date Is: | ACTUAL | Measured TD: | 15076 ft. | Measured PB depth: | 15022 ft. | True Vertical TD: | 7583 ft. | True Vertical PB depth: | 7583 ft. | Top PZ Location: | Sec:22 Twp: 1N 67W | Footage: 1507 FNL 972 FEL | Bottom Hole Location: | Sec:10 Twp: 1N 67W | Footage: 333 S 924 E | Log Types: | MWD/GR, CL, CBL, CNL | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 42 , Citings Type: ACTUAL | Cement: | Sacks: 64, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1893 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 682, Top: 0 ft., Bottom: 1893 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 7 in., Top: 0 ft., Depth: 5862 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 550, Top: 0 ft., Bottom: 5862 ft., Determination Method: CBL | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5663 ft., Depth: 15071 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 565, Top: 5663 ft., Bottom: 15071 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4675 ft. | | | | SHARON SPRINGS | 7270 ft. | | | | NIOBRARA | 7294 ft. | | | | FORT HAYS | 7840 ft. | | | | CODELL | 8067 ft. | | | | CARLILE | 9895 ft. | | | |
Formation CARL Formation Classification: OW Status: CM - 1/30/2019 Interval Top: 9895 ft. Interval Bottom: 10041 ft. Completed Information for Formation CARLILE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CARLILE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2019 | Treatment End Date: | N/A | Treatment Summary: | Carlile: 9895-10041 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CARL. |
| Perforation Data: | Interval Top: | 9895 ft. | # Of Holes: | 384 | Interval Bottom: | 10041 ft. | Hole Size: | 0.44 in. |
|
Formation CODL Formation Classification: OW Status: CM - 1/30/2019 Interval Top: 8100 ft. Interval Bottom: 14438 ft. Completed Information for Formation CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2019 | Treatment End Date: | N/A | Treatment Summary: | Codell: 8100-9895, 10041-10267, 10446-14438 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 8100 ft. | # Of Holes: | 384 | Interval Bottom: | 14438 ft. | Hole Size: | 0.44 in. |
|
Formation CLCDFH Formation Classification: OW Status: PR - 5/1/2022 Interval Top: 8017 ft. Interval Bottom: 15014 ft. Completed Information for Formation CARLILE-CODELL-FORT HAYS | 1st Production Date: | 6/14/2018 | Choke Size: | | Formation Name: | CARLILE-CODELL-FORT HAYS | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 4/9/2018 | Treatment End Date: | 4/16/2018 | Treatment Summary: | PERF AND FRAC FROM 8017-15014.
148 BBL HCL-7.5, 117,280 BBL LIBERTYFR, 2,232 BBL PUMP DOWN, 119,660 TOTAL FLUID, 2,767,000# 30/50 OTTAWA/ST. PETERS, 784,410# 40/70 OTTAWA/ST. PETERS, 3,551,410# TOTAL SAND. | Total fluid used in treatment (bbls): | 119660 | Max pressure during treatment (psi): | 7737 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 17 | Total acid used in treatment (bbls): | 148 | Min frac gradient (psi/ft): | 0.83 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 6588 | Fresh water used in treatment (bbls): | 119512 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 3551410 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7568 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 7/1/2018 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 532 | BBLS_OIL | 153 | BTU_GAS | 1337 | CALC_BBLS_H2O | 532 | CALC_BBLS_OIL | 153 | CALC_GOR | 928 | CALC_MCF_GAS | 142 | CASING_PRESS | 2851 | GRAVITY_OIL | 54 | MCF_GAS | 142 | TUBING_PRESS | 2192 |
| Perforation Data: | Interval Top: | 8017 ft. | # Of Holes: | 384 | Interval Bottom: | 15014 ft. | Hole Size: | 0.44 in. |
|
Formation FTHYS Formation Classification: OW Status: CM - 1/30/2019 Interval Top: 8017 ft. Interval Bottom: 14975 ft. Completed Information for Formation FORT HAYS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | FORT HAYS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/30/2019 | Treatment End Date: | N/A | Treatment Summary: | Fort Hays: 8017-8100, 10267-10446, 14438-14975 | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FTHYS. |
| Perforation Data: | Interval Top: | 8017 ft. | # Of Holes: | 384 | Interval Bottom: | 14975 ft. | Hole Size: | 0.44 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 4530 |
Total Gas Produced (MCF) | 132967 |
GOR | 29352 |
GOR Determination | MCFE |
Average BOE per Day | 75.037 |
Average MCFE per Day | 435.223 |
Federal Financial Assurance | i | |
|
|