Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43384
Well Classification: OW Status: SI - 12/1/2025
Well Name/No:Clark #14J-343
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2025
FacilityID:446773LocationID:323242
County:WELD #123Location:NWNE 14 5N65W 6
Field:WATTENBERG - #90750Elevation:4616 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:550FNL  2189 FELLat/Long: 40.405173 / -104.628943Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.405175 / -104.628943Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/3/2017
End Date: 4/20/2017
Reported: 6/5/2017
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2025             Measured TD: 14846 ft.    Vertical TD: 6844 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/20/2018
Proposed Top PZ Location:Sec:14 Twp: 5N 65W Footage: 507 FNL  1001 FWL
Bottom Hole Location:Sec:23 Twp: 5N 65W Footage: 2659 FSL  959 FWL
Proposed Depth/Form:14859 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 560, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1400 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 920, Top: 0 ft., Bottom: 1400 ft.
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14859 ft., Weight: 20 , Citings Type: PLANNED
Cement:Sacks: 2035, Top: 0 ft., Bottom: 14859 ft.

Wellbore Completed
Completion Date:12/16/2016
Spud Date:12/7/2016Spud Date Is:ACTUAL
Measured TD:14846 ft.Measured PB depth:14825 ft.
True Vertical TD:6844 ft.True Vertical PB depth:6844 ft.
Top PZ Location:Sec:14 Twp: 5N 65WFootage: 507 FNL  1001 FWL
Bottom Hole Location:Sec:23 Twp: 5N 65WFootage: 2659 FSL  959 FWL
Log Types:CBL, MWD, Cased hole neutron (DIL in 123-12759)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1546 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 720, Top: 0 ft., Bottom: 1546 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 14840 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: 2105, Top: 550 ft., Bottom: 14840 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3705 ft.
SUSSEX4524 ft.
SHARON SPRINGS6837 ft.
NIOBRARA6977 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  SI - 12/1/2025                 Interval Top: 7416 ft.    Interval Bottom: 14783 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:5/4/2017Choke Size: 
Formation Name:NIOBRARACommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/3/2017Treatment End Date:4/20/2017
Treatment Summary:43 Stage Plug and Perf, Perf'd from 7416-14671, 3 Toe Sleeves from 14689-14783 Total Fluid: 148,221 bbls Gel Fluid: 87,639 bbls Slickwater Fluid: 59,454 bbls 15% HCl Acid: 1,128 bbls Total Proppant: 7,881,787 lbs Silica Proppant: 7,881,787 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):148221Max pressure during treatment (psi):4385
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:43
Total acid used in treatment (bbls):1128Min frac gradient (psi/ft):0.95
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5657
Fresh water used in treatment (bbls):147093Disposition method For flowback:DISPOSAL
Total proppant used (lbs):7881787Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 767
BBLS_OIL 239
BTU_GAS 1285
CALC_BBLS_H2O 767
CALC_BBLS_OIL 239
CALC_GOR 4631
CALC_MCF_GAS 1107
CASING_PRESS 2846
GRAVITY_OIL 50
MCF_GAS 1107
TUBING_PRESS 1910
Perforation Data:
Interval Top:7416 ft.# Of Holes:2184
Interval Bottom:14783 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)1471
Total Gas Produced (MCF)19390
GOR13181
GOR DeterminationBOE
Average BOE per Day13.294
Average MCFE per Day77.093

 Federal Financial Assurance  i 

 Tribal Well  i No