| 404590539 | Form 17 | 3/10/2026 | 3/23/2026 | SHUT-IN | 6 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 4 | 4 | No | -- | -- | Remediation follow up test. 6 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404111585 | Form 17 | 2/20/2025 | 2/28/2025 | SHUT-IN | 19 | DOWN TO 0 | GAS | 0 | NO FLOW | 417 | 417 | No | -- | -- | Remediation follow up test. 19 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/14/2024 | 4/1/2024 | | 24 | Down to Zero | -- | 0 | No Flow | 284 | 305 | No | No | No | Annual Test. 24 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/17/2023 | 3/27/2023 | | 0 | No Flow | -- | 0 | No Flow | 229 | 239 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| 403216538 | Form 17 | 11/1/2022 | 11/2/2022 | PLUNGER LIFT | 20 | DOWN TO 0 | GAS | 0 | NO FLOW | 259 | 260 | No | -- | -- | Abatement system follow up test. 20 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402984421 | Form 17 | 3/14/2022 | 3/15/2022 | PLUNGER LIFT | 93 | CONTINUOUS | GAS | 0 | WHISPER | 339 | 339 | Yes | -- | -- | Annual Test, 93 PSI continuous whisper gas flow blew down to 0 PSI within 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402815993 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 37 | DOWN TO 0 | GAS | 0 | NO FLOW | 340 | 337 | No | -- | -- | Abatement system follow up test, 37 PSI gas blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402670338 | Form 17 | 4/21/2021 | 4/26/2021 | | 117 | WHISPER | GAS | 0 | NO FLOW | 586 | 586 | Yes | -- | -- | Annual Test 137 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402425827 | Form 17 | 4/27/2020 | 6/18/2020 | | 0 | WHISPER | -- | 0 | WHISPER | 671 | 671 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402236396 | Form 17 | 11/7/2019 | 11/12/2019 | PLUNGER LIFT | 288 | GAS | -- | 27 | WHISPER | 757 | 757 | Yes | Yes | -- | Annual TEst, 288 PSI slight gas flow blew down to a whisper for the duration of the 30 min test. 27 PSI at the end of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry. |
| 401347319 | Form 17 | 7/2/2017 | 7/19/2017 | FLOWING | 80 | CONTINUOUS | -- | 0 | NO FLOW | 1970 | 1969 | No | -- | -- | Post Production test, intitial pressure 80 PSI gradually bled down to 0 PSI no flow for duration of test
|
| 401237234 | Form 17 | 2/22/2017 | 3/20/2017 | SHUT-IN | 700 | VAPOR | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Initial pressure of 700 psi dropped to 250 psi within the first 5 minutes of test, then decreased to zero within 10 minutes. |