Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-43018
Well Classification: OW Status: PR - 10/18/2017
Well Name/No:CAMENISCH #36N-22HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/18/2017
FacilityID:445336LocationID:336504
County:WELD #123Location:SWNE 15 2N68W 6
Field:WATTENBERG - #90750Elevation:4874 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2228FNL  2238 FELLat/Long: 40.139980 / -104.987767Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.139980 / -104.987770Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/8/2017
End Date: 9/24/2017
Reported: 11/20/2017
Days to report: 57
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 10/18/2017             Measured TD: 15862 ft.    Vertical TD: 7376 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 10/18/2017
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/30/2018
Proposed Top PZ Location:Sec:15 Twp: 2N 68W Footage: 2067 FNL  2138 FEL
Bottom Hole Location:Sec:22 Twp: 2N 68W Footage: 487 FSL  2123 FEL
Proposed Depth/Form:15744 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 280, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 710, Top: 0 ft., Bottom: 1800 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 15734 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 1858, Top: , Bottom: 15734 ft.

Wellbore Completed
Completion Date:5/1/2017
Spud Date:3/5/2017Spud Date Is:ACTUAL
Measured TD:15862 ft.Measured PB depth:15760 ft.
True Vertical TD:7376 ft.True Vertical PB depth:7374 ft.
Top PZ Location:Sec:15 Twp: 2N 68WFootage: 2067 FNL  2138 FEL
Bottom Hole Location:Sec:22 Twp: 2N 68WFootage: 487 FSL  2123 FEL
Log Types:CBL, MWD/GR, (CNL in 05-123-43017), (IND in 05-123-24995, 05-123-26359, 05-123-08587)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 110 ft., Weight: 42.1 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 110 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1861 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 732, Top: 0 ft., Bottom: 1861 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 15852 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 2075, Top: 0 ft., Bottom: 15852 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4214 ft.
SHARON SPRINGS7224 ft.
NIOBRARA7371 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 10/18/2017                Interval Top: 7772 ft.    Interval Bottom: 15745 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:10/5/2017Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/7/2017Treatment End Date:9/24/2017
Treatment Summary:"PERF AND FRAC FROM 7772-15,745 1471 BBL 7.5% HCL ACID, 279,863 BBL SLICKWATER, 18,123 BBL PUMP DOWN, - 299,457 TOTAL FLUID 2,396,100# 40/70 OTTAWA/ST. PETERS, - 2,396,100# TOTAL SAND."
Total fluid used in treatment (bbls):299457Max pressure during treatment (psi):7742
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:77
Total acid used in treatment (bbls):1471Min frac gradient (psi/ft):0.89
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1151
Fresh water used in treatment (bbls):297986Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2396100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/18/2017Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 112
BBLS_OIL 171
BTU_GAS 1255
CALC_BBLS_H2O 112
CALC_BBLS_OIL 171
CALC_GOR 1807
CALC_MCF_GAS 309
CASING_PRESS 1800
GRAVITY_OIL 56
MCF_GAS 309
Perforation Data:
Interval Top:7772 ft.# Of Holes:1824
Interval Bottom:15745 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)3260
Total Gas Produced (MCF)90203
GOR27669
GOR DeterminationMCFE
Average BOE per Day51.538
Average MCFE per Day298.935

 Federal Financial Assurance  i 

 Tribal Well  i No