Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-43018CAMENISCH
36N-22HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
10/18/2017
WATTENBERG
90750
WELD  123
SWNE 15 2N68W 6
336504
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1861 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404156588Form 174/7/20254/8/2025 83CONTINUOUS GAS0 NO FLOW 239234YesYesNoANNUAL- Surface Casing produced no liquid.
403758437Form 174/17/20244/17/2024 66CONTINUOUS GAS0 NO FLOW 233228YesYesNoSurface Casing produced no liquid.
403343819Form 173/9/20233/13/2023 47CONTINUOUS GAS1 WHISPER 369396YesYesNoSurface Casing produced no liquid.
402967944Form 172/24/20222/28/2022 164CONTINUOUS GAS1 WHISPER 344364No----Surface Casing produced no liquid.
402765678Form 177/26/20217/30/2021 138CONTINUOUS GAS1 WHISPER 334353No---- Surface Casing produced no liquid.
402736019Form 176/22/20217/1/2021 200CONTINUOUS GAS1 WHISPER 350348No----Surface Casing produced no liquid.
402724461Form 176/15/20216/21/2021 208CONTINUOUS GAS1 WHISPER 360357No----Surface Casing produced no liquid.
402649329Form 173/4/20214/6/2021 35CONTINUOUS GAS0 NO FLOW 358368YesYesNo Surface Casing produced no liquid.
Click for SpecificsFull5/5/20206/8/2020 14Continuous Flow 0Down To Zero457443NoNoNoSurface casing produced no liquid.
Click for SpecificsFull5/17/201912/10/2019 13Gas 1Whisper (Very Low Flow)521522NoNoNoSurface casing produced no liquid.
401500109Form 1711/28/20171/2/2018 1WHISPER --0 DOWN TO 0 24432442No----Surface casing produced no fluids. Surface casing shut in for 15 min ended with 0 PSI. Post turn on to sales form 17.
401366760Form 177/27/20178/7/2017 8GAS --1 WHISPER 5050No----SURFACE CASING PRODUCED NO FLUIDS. SURFACE CASING BLOWN DOWN FOR EXTRA 30 MIN ENDED WITH A WHISPER OF GAS. SURFACE CASING SHUT IN FOR 15 MIN ENDED WITH 3 PSI.