|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 4/6/2016 Measured TD: 6226 ft. Vertical TD: 6017 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 4/6/2016 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 6/29/2017 | | Proposed Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 2511 FSL 1868 FWL | | Bottom Hole Location: | Sec:7 Twp: 10N 57W | Footage: 2511 FSL 1868 FWL | | Proposed Depth/Form: | 13552 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 535-508 , Unit Acreage: 960, Drill Unit: N/2 S7, All S6 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1950 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 863, Top: 0 ft., Bottom: 1950 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 13628 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2251, Top: 0 ft., Bottom: 13628 ft. | | Casing: | String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5467 ft., Depth: 13552 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 2/29/2016 | | Spud Date: | 2/27/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 6226 ft. | Measured PB depth: | 6226 ft. | | True Vertical TD: | 6017 ft. | True Vertical PB depth: | 6017 ft. | | Bottom Hole Location: | Sec:7 Twp: 10N 57W | Footage: 2511 FSL 1868 FWL | | Log Types: | Mud, LWD/MWD, (DIL in API 123-41781) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2027 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 920, Top: 0 ft., Bottom: 2027 ft., Determination Method: VISU | | Additional Cement: | String Type: OPEN HOLE , Top: 4543 ft., Depth: 6226 ft., Bottom: 6226 ft., Sacks: 640, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1700 ft. | | N | N | | HYGIENE | 3550 ft. | | N | N | | SHARON SPRINGS | 5738 ft. | | N | N | | NIOBRARA | 5752 ft. | | N | N | | FORT HAYS | 5978 ft. | | N | N | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: PR - 8/1/2017 Measured TD: 13513 ft. Vertical TD: 6023 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW PR - 8/1/2017 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/2/2018 | | Proposed Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 308 FNL 1892 FWL | | Bottom Hole Location: | Sec:6 Twp: 10N 57W | Footage: 652 FNL 1964 FWL | | Proposed Depth/Form: | 13628 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CARL , Formation: CARLILE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 535-508 , Unit Acreage: 960, Drill Unit: N/2 S7, All S6 | | Formation And Spacing: | Code: FTHYS , Formation: FORT HAYS , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 92 , Citings Type: PLANNED | | Cement: | Sacks: 179, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2027 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 863, Top: 0 ft., Bottom: 2027 ft. | | Casing: | String Type: 1ST, Hole Size: 8.25 in., Size: 5.5 in., Top: 0 ft., Depth: 13628 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 2251, Top: 0 ft., Bottom: 13628 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/7/2016 | | Spud Date: | 3/2/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 13513 ft. | Measured PB depth: | 13465 ft. | | True Vertical TD: | 6023 ft. | True Vertical PB depth: | 6022 ft. | | Top PZ Location: | Sec:7 Twp: 10N 57W | Footage: 308 FNL 1892 FWL | | Bottom Hole Location: | Sec:6 Twp: 10N 57W | Footage: 652 FNL 1964 FWL | | Log Types: | Mud, LWD/MWD, CBL, (DIL in API 123-41781) | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 101 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 101 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2027 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 920, Top: 0 ft., Bottom: 2027 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.5 in., Size: 5.5 in., Top: 0 ft., Depth: 13496 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 2371, Top: 2021 ft., Bottom: 13496 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 1700 ft. | | N | N | | HYGIENE | 3551 ft. | | N | N | | SHARON SPRINGS | 5702 ft. | | N | N | | NIOBRARA | 5715 ft. | | N | N | | FORT HAYS | 5978 ft. | | N | N | | CODELL | 6016 ft. | | N | N |
Formation CODL Formation Classification: OW Status: PR - 9/3/2017 Interval Top: 8530 ft. Interval Bottom: 13388 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/10/2017 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/8/2017 | Treatment End Date: | 5/16/2017 | | Treatment Summary: | 50 Stage Plug & Perf, 605066# 100 Mesh , 2644039# 40/70 Prem White sand, 71 bbls 15% HCl, 134309 bbls slickwater. Skipped stages 34-50 | | Total fluid used in treatment (bbls): | 134381 | Max pressure during treatment (psi): | 7055 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.33 | | Type Of gas: | | Number Of staged intervals: | 33 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.80 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 10914 | | Fresh water used in treatment (bbls): | 134309 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 3249105 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 3 in. | Tubing Setting Depth: | 5776 ft. | | Tubing Packer Depth: | 5766 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/3/2017 | Test Method: | Separator | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 852 | | BBLS_OIL | 260 | | BTU_GAS | 1313 | | CALC_BBLS_H2O | 852 | | CALC_BBLS_OIL | 260 | | CALC_GOR | 185 | | CALC_MCF_GAS | 48 | | CASING_PRESS | 940 | | GRAVITY_OIL | 37 | | MCF_GAS | 48 | | TUBING_PRESS | 520 |
| | Perforation Data: | | Interval Top: | 8530 ft. | # Of Holes: | 1361 | | Interval Bottom: | 13388 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1202 |
| Total Gas Produced (MCF) | 10663 |
| GOR | 8871 |
| GOR Determination | BOE |
| Average BOE per Day | 8.322 |
| Average MCFE per Day | 48.246 |
| Federal Financial Assurance | i | |
|
|