Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-41633
Well Classification: OW Status: PA - 11/10/2025
Well Name/No:R&R Farms #29L-441
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date11/10/2025
FacilityID:442049LocationID:442014
County:WELD #123Location:SWSW 29 5N63W 6
Field:WATTENBERG - #90750Elevation:4574 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:641FSL  404 FWLLat/Long: 40.365040 / -104.468170Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.365041 / -104.468194Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/1/2016
End Date: 2/2/2016
Reported: 2/24/2016
Originally Reported: 2/17/2016
Days to report: 22
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: AB - 11/10/2025             Measured TD: 11040 ft.    Vertical TD: 6558 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        AB - 11/10/2025
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:6/12/2017
Proposed Top PZ Location:Sec:29 Twp: 5N 63W Footage: 850 FSL  950 FWL
Bottom Hole Location:Sec:29 Twp: 5N 63W Footage: 501 FNL  966 FWL
Proposed Depth/Form:11014 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7069 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 500 ft., Bottom: 7069 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 5869 ft., Depth: 11014 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:8/5/2015
Spud Date:7/28/2015Spud Date Is:ACTUAL
Measured TD:11040 ft.Measured PB depth:11033 ft.
True Vertical TD:6558 ft.True Vertical PB depth:6558 ft.
Top PZ Location:Sec:29 Twp: 5N 63WFootage: 850 FSL  950 FWL
Bottom Hole Location:Sec:29 Twp: 5N 63WFootage: 501 FNL  966 FWL
Log Types:CBL, MWD (DIL in 05-123-25134)
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1038 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 550, Top: 0 ft., Bottom: 1038 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 7104 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 210 ft., Bottom: 7104 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6725 ft., Depth: 11036 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3362 ft.
SUSSEX3990 ft.
SHANNON4626 ft.
SHARON SPRINGS6323 ft.
NIOBRARA6445 ft.
FORT HAYS6940 ft.
CODELL7053 ft.
CARLILE8192 ft.

Formation CARL                     Formation Classification:  OW                     Status:  CM - 2/21/2025                 Interval Top: 8192 ft.    Interval Bottom: 10256 ft.

 Completed Information for Formation CARLILE
1st Production Date:N/AChoke Size: 
Formation Name:CARLILECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/25/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 8,192'-8,998' 9,212'-9,374' 10,073'-10,256'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CARL.
Perforation Data:
Interval Top:8192 ft.# Of Holes:0
Interval Bottom:10256 ft.Hole Size:

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 2/21/2025                 Interval Top: 7541 ft.    Interval Bottom: 7758 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/25/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,541'-7,758'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:7541 ft.# Of Holes:0
Interval Bottom:7758 ft.Hole Size:

Formation CLCDFH                 Formation Classification:  OW                 Status:  AB - 11/10/2025                Interval Top: 7172 ft.    Interval Bottom: 11040 ft.

 Completed Information for Formation CARLILE-CODELL-FORT HAYS
1st Production Date:3/5/2016Choke Size: 
Formation Name:CARLILE-CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/1/2016Treatment End Date:2/2/2016
Treatment Summary:20 Stage Sliding Sleeve, Swell Packer set at 7,172' Total Fluid: 79,183 bbls Gel Fluid: 43,974 bbls Slickwater Fluid: 35,236 bbls Total Proppant: 4,379,180 lbs Silica Proppant: 4,379,180 lbs Method for determining flowback: measuring flowback tank volumes.
Total fluid used in treatment (bbls):79183Max pressure during treatment (psi):4104
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.94
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):5168
Fresh water used in treatment (bbls):79183Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4379180Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 149
BBLS_OIL 268
BTU_GAS 1290
CALC_BBLS_H2O 149
CALC_BBLS_OIL 268
CALC_GOR 2213
CALC_MCF_GAS 593
CASING_PRESS 500
GRAVITY_OIL 49
MCF_GAS 593
TUBING_PRESS 1112
Perforation Data:
Interval Top:7172 ft.# Of Holes:0
Interval Bottom:11040 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/21/2025                 Interval Top: 7172 ft.    Interval Bottom: 11040 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/25/2020Treatment End Date:N/A
Treatment Summary:Completed Depths: 7,172'-7,541' 7,758'-8,192' 8,998'-9,212' 9,374'-10,073' 10,256'-11,040'
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7172 ft.# Of Holes:0
Interval Bottom:11040 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY11/10/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
03/31/2029
Inactive ExceptionN 
Noticed InactiveYNoticed Date
06/19/2024
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No